CALL, PR, REPLACE commands to optimize a TPP @PSDettmer
CALL, PR, REPLACE commands to optimize a TPP  @PSDettmer
Uploaded March 2012 | Updated September 2026, 2 weeks ago
Each student developed 3 programs. One for each number. Programs were tested and run individually. The assignment required them to combine all three programs into one, using the CALL instruction and to optimize program flow. Students accomplished this by eliminating individual home positions in each program and replacing them with a global position [PR] in the CALL program. They also improved efficiency (run time) by replacing all "SPEED" motion elements to the allowed maximum of 250mm/sec.
Students developed the script, narration and video in a small group setting.
All training is offered for FREE on state of the art equipment and software through a federal grant by the Economic Development Administration (EDA) in the cities of Portage, Reedsburg and Waterloo.
Students are enrolled in "Robotics for Industrial Automation - level 1" funded through the EDA.
CALL, PR, REPLACE commands to optimize a TPPFANUC Robot to ControlLogix PLC - Digital Input and Output exchangeFANUC Robotics - Remote Start from ControlLogix PLCCreating a new project in Studio5000 and adding modulesFANUC Teach Pendant programming - Group 2Frames in Robotics - User Frames (UFRAME)Setting up FANUC Robot Ethernet IP to Logix controllerRobotics2 Lab: Block & PegCreating an Ethernet/IP Driver in RSLinx for an Allen-Bradley PLCMadison College - Robot Applications - work in progress....IP Address with local admin accountElectro-Mechanical Technology - Fall 2023 Capstone Showcase
Robotics & Automation - Electro-Mechanical |

CALL, PR, REPLACE commands to optimize a TPP

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER