California High Speed Rail Update @HighSpeedRailAlliance
California High Speed Rail Update  @HighSpeedRailAlliance
Uploaded May 2022 | Updated September 2026, 52 minutes ago
Speaker: Brian Annis, Chief Financial Officer, California High-Speed Rail Authority.

In November of 2008, 53% of California voters decided to take an innovative step forward and allocate $9.95 billion in bond dollars to the creation of a California high-speed rail line. The first high-speed and electrified train in the nation, California high-speed rail will stretch 494 miles from San Francisco to Los/Angeles Anaheim. The Phase 2 system will extend this segment 300 more miles with connections to Sacramento and San Diego. The train will travel at approximately 200mph. A 6 hour and 12-minute car ride from San Francisco to Los Angeles will one day be a brief 2 hour and 40-minute trip on an air conditioned, Wi-Fi-equipped, sustainable bullet train.

California high-speed rail is currently in construction along 119-miles in the Central Valley. 380 miles of the 494 Phase 1 system has been environmentally cleared. Right-of-way, utility relocations, and design for future stations are all advancing. Mr. Annis provided a general program overview and detailed the progress that has been made on California High-Speed Rail.
California High Speed Rail UpdateAccelerating the Permitting Process for High Speed Rail ProjectsWhat’s the Latest on Federal Funding for Trains and Transit?Why Metra Should Be ElectrifiedShifting Modes With Russell KingHelp Save Our Long-Distance TrainsPlanning an Integrated Rail NetworkManchester Airport: Connections, Funding and Future DevelopmentIllinois Transit Bill Could Deliver the First Real Money for Intercity RailFast Track: The Extraordinary Story of High-Speed RailForm Follows Function: Capacity Before Architecture at Penn StationCorridor ID Update and Passenger Rail Advocacy
High Speed Rail Alliance |

California High Speed Rail Update

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER