C Line Extension to Torrance Hybrid Alignment Simulation @losangelesmetro
C Line Extension to Torrance Hybrid Alignment Simulation  @losangelesmetro
Uploaded June 2026 | Updated September 2026, 2 weeks ago
This video presents a conceptual simulation of the C Line (Green) Extension to Torrance – Metro ROW Hybrid Alternative Alignment. The animation takes viewers along the proposed rail corridor, illustrating how the light rail line would operate within the Metro right-of-way, including aerial structures, at-grade crossings, station areas, relocated freight tracks, and connections through South Bay communities. The simulation provides a visual representation of the proposed alignment and demonstrates how the project could improve regional transit access while integrating with existing transportation infrastructure.
C Line Extension to Torrance Hybrid Alignment SimulationGo Metro to BMO Stadium 🚍🚆➡️🏟️Eastmont Community CenterUs recording everything from our station visit to show our fansC Line Extension to Torrance Final EIR ReleaseSummer is soccer season in LA. Go Metro to the Rose Bowl!For Youth, By Youth: Metro’s FREE Event at Union StationNobody Expected This From LA (Yes, We Have A Subway)Obedece todas las señales del tren. La seguridad empieza contigo.2024_Spring_STC Meeting Recording ENG1 de junio de 2026: Broadway Bus Priority LanesThis Is How LA Moves: The Athlete (Zebreda Dunham)
Metro Los Angeles |

C Line Extension to Torrance Hybrid Alignment Simulation

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER