Burke #4 Mill Restoration Series - Episode 09
The heavy custom bench is done — now it’s time to level it, mount the chip/oil pan, and install the column!
In this video I:
Level the bench using the adjustable half-13 feet and jam nuts
Bore the clearance hole for the knee/jack screw
Position and mark the chip pan (offset for motor balance)
Drill for lag screws and the knee screw
Measure and make custom shims (≈0.103" and ≈0.032") so the aluminum casting isn’t stressed or racked
Bolt the chip pan down snugly with ½" lag screws
Set the column in place, check for rock, and secure it with ½-13 bolts (one longer replacement needed)
The bench is now solid and level, the pan is shimmed properly, and the column is mounted with almost no perceptible rock. Progress!
Full Restoration Playlist: youtube.com/playlist?list=PLaamliiI72nsHZKABfbK03mjWkMFkdd_M
Previous video (Bench Build Part 2): youtube.com/watch?v=AfSKJ530-ZU
What’s next? Spindle (new bearings + recommended grease) or the knee & jack screw? Let me know in the comments — your input helps decide the order.
MyHeap.com
Thanks for watching, commenting, liking, and subscribing. Have a blessed day!
#BurkeMill #MillRestoration #HorizontalMill #HomeMachineShop #Metalworking #MachineRestoration #Workbench #shopbuild
0:00 Intro & overview
0:20 Mock-up & plan (level bench, bore for knee screw, shim casting)
2:00 Laying out the chip pan (offset, depth)
3:00 Marking & drilling holes (Forstner + lag holes)
4:00 Leveling the bench with adjustable feet
6:15 Chip pan warpage check & first shim
8:00 Making the 0.103" shim + dial indicator check
9:00 Second shim (≈0.032") & bolting the pan down
11:00 Column install & rock check
13:00 Final bolt-up & summary
14:30 What’s next? (spindle vs. knee) + close
Burke #4 Mill Restoration Series - Episode 09
The heavy custom bench is done — now it’s time to level it, mount the chip/oil pan, and install the column!
In this video I:
Level the bench using the adjustable half-13 feet and jam nuts
Bore the clearance hole for the knee/jack screw
Position and mark the chip pan (offset for motor balance)
Drill for lag screws and the knee screw
Measure and make custom shims (≈0.103" and ≈0.032") so the aluminum casting isn’t stressed or racked
Bolt the chip pan down snugly with ½" lag screws
Set the column in place, check for rock, and secure it with ½-13 bolts (one longer replacement needed)
The bench is now solid and level, the pan is shimmed properly, and the column is mounted with almost no perceptible rock. Progress!
Full Restoration Playlist: youtube.com/playlist?list=PLaamliiI72nsHZKABfbK03mjWkMFkdd_M
Previous video (Bench Build Part 2): youtube.com/watch?v=AfSKJ530-ZU
What’s next? Spindle (new bearings + recommended grease) or the knee & jack screw? Let me know in the comments — your input helps decide the order.
MyHeap.com
Thanks for watching, commenting, liking, and subscribing. Have a blessed day!
#BurkeMill #MillRestoration #HorizontalMill #HomeMachineShop #Metalworking #MachineRestoration #Workbench #shopbuild
0:00 Intro & overview
0:20 Mock-up & plan (level bench, bore for knee screw, shim casting)
2:00 Laying out the chip pan (offset, depth)
3:00 Marking & drilling holes (Forstner + lag holes)
4:00 Leveling the bench with adjustable feet
6:15 Chip pan warpage check & first shim
8:00 Making the 0.103" shim + dial indicator check
9:00 Second shim (≈0.032") & bolting the pan down
11:00 Column install & rock check
13:00 Final bolt-up & summary
14:30 What’s next? (spindle vs. knee) + close