Plant components cannot always be maintained. In the case of the so-called preflash column, replacement was unavoidable, the end of the service life had been reached, and the energy efficiency was no longer sufficient. We accompany project manager Daniel Steiner in this literally "giant" project, at the end of which a new column with enormous CO2 savings is put into operation.
------------------------------------------------------------
Subscribe to the OMV YouTube Channel: youtube.com/OMV
Follow our Blog: blog.omv.com
Follow us on Instagram: instagram.com/omv
Follow us on Facebook: facebook.com/omv
Follow us on LinkedIn: linkedin.com/company/omv
Follow us on Twitter: twitter.com/omv
Plant components cannot always be maintained. In the case of the so-called preflash column, replacement was unavoidable, the end of the service life had been reached, and the energy efficiency was no longer sufficient. We accompany project manager Daniel Steiner in this literally "giant" project, at the end of which a new column with enormous CO2 savings is put into operation.
------------------------------------------------------------
Subscribe to the OMV YouTube Channel: youtube.com/OMV
Follow our Blog: blog.omv.com
Follow us on Instagram: instagram.com/omv
Follow us on Facebook: facebook.com/omv
Follow us on LinkedIn: linkedin.com/company/omv
Follow us on Twitter: twitter.com/omv