Uploaded August 2025 | Updated November 2026, 1 week ago
Inside Kobelco’s Okubo Factory – How Japan Builds the World’s Biggest Cranes 🏗️
Take an exclusive look inside Kobelco’s Okubo Factory in Japan, the company’s global hub for crawler cranes production. This is where some of the world’s biggest and most advanced cranes are designed, built, and tested before being shipped to customers worldwide.
In this documentary-style video, we explore every step of the process:
Fabrication & Machining – welding and machining steel plates and tubes into the main structures like booms and frames.
Assembly – sub-assemblies of engines and winches combined with the upper structure and undercarriage to form the crane’s body.
Painting – a two-stage process with primer and top-coat lines, applying both standard and customer-specified colors.
Testing – rigorous checks, including lifting trials, to ensure safety, durability, and performance.
Shipping – final installation of equipment, decals, and pre-shipment inspections before delivery worldwide.
With over 60 years of history, the Okubo Plant remains Kobelco’s flagship for innovation and precision in heavy machinery. Every crane that leaves its gates represents Japanese craftsmanship, engineering excellence, and a commitment to quality.
👉 Watch now to see how Kobelco builds the machines that power some of the biggest construction projects on earth.
#Kobelco #Cranes #FactoryTour #JapanFactory #HeavyMachinery
Inside Kobelco’s Okubo Factory – How Japan Builds the World’s Biggest Cranes 🏗️
Take an exclusive look inside Kobelco’s Okubo Factory in Japan, the company’s global hub for crawler cranes production. This is where some of the world’s biggest and most advanced cranes are designed, built, and tested before being shipped to customers worldwide.
In this documentary-style video, we explore every step of the process:
Fabrication & Machining – welding and machining steel plates and tubes into the main structures like booms and frames.
Assembly – sub-assemblies of engines and winches combined with the upper structure and undercarriage to form the crane’s body.
Painting – a two-stage process with primer and top-coat lines, applying both standard and customer-specified colors.
Testing – rigorous checks, including lifting trials, to ensure safety, durability, and performance.
Shipping – final installation of equipment, decals, and pre-shipment inspections before delivery worldwide.
With over 60 years of history, the Okubo Plant remains Kobelco’s flagship for innovation and precision in heavy machinery. Every crane that leaves its gates represents Japanese craftsmanship, engineering excellence, and a commitment to quality.
👉 Watch now to see how Kobelco builds the machines that power some of the biggest construction projects on earth.
#Kobelco #Cranes #FactoryTour #JapanFactory #HeavyMachinery




![Hino Trucks Plant - Production Light and Medium Duty Trucks
Hino Trucks Plant - Production Light and Medium Duty Trucks
Hino, is a Japanese manufacturer of commercial vehicles and diesel engines (including those for trucks, buses and other vehicles) headquartered in Hino, Tokyo. The company is a leading producer of medium and heavy-duty diesel trucks in Asia.
In the United States, Hino has operated since 1995. Hino Motors Manufacturing U.S.A., Inc. assembles medium-duty trucks at its Williamstown, West Virginia, plant. They opened a second plant in Mineral Wells, West Virginia in late 2018. Its manufacturing facilities in Ontario, California, and Marion, Arkansas, produce axles, knuckles, and suspension components for Toyotas Tacoma, Tundra, and Sequoia models. Hinos Parts Distribution Center in Mira Loma, California, supplies Latin American and Caribbean distributors with genuine Hino service parts. The 18,000 m2 assembly plant in Williamstown, West Virginia, assembles Class 6-7 Hino trucks at an annual capacity of 10,000 units. The plant was opened in November 2007 and employs about 200. The plant in Long Beach, California, where Hinos US-based medium duty truck production had begun in 2004, was closed in 2007 and its production was transferred to the West Virginia facility.[citation needed] Production in West Virginia began with Class 4-7 trucks but the Class 4-5 products were dropped after 2010 model year and the plant now focuses on Class 6-7 products. Opened in 2016, Hino operates a distribution center in Gahanna Ohio.
https://www.youtube.com/c/Automotivegarage Hino Trucks Plant - Production Light and Medium Duty Trucks](https://i.ytimg.com/vi/MftirlCiDgA/mqdefault.jpg)





