@Jer_Schmidt
  @Jer_Schmidt
Jer Schmidt | Building a table to hold my vise @Jer_Schmidt | Uploaded January 2019 | Updated October 2024, 3 minutes ago.
Thank you for watching!

The finished table is about 865lbs (390kg). With the vise it's about 1,025lb (465kg). The steel for the frame cost $235. The top was a scrap, cut from the center of a ring, and I don't remember the exact cost but I guess $400. The vise cost more than twice as much as the table, but both should last a few lifetimes.

Support me on Patreon:
patreon.com/JerSchmidt
Building a table to hold my viseRolling concrete camera rigTable Saw StationAll about my CNC machineBelt grinder small wheel attachmentBox joints with the Incremental Table Saw FenceHardware boxes that wont shift in a drawer!Modular Cabinet FeetHow to make a torsion springBuilding the Gen 1 Belt GrinderCustom tool stand for my belt grinderShop computer wall mount

Building a table to hold my vise @Jer_Schmidt

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER