Uploaded August 2025 | Updated November 2026, 2 hours ago
The 75 year old aqueduct needed to be replaced, the new design was a lot more sturdy and required a large concrete footing for several pre cast box culverts to sit on. In order to lay the concrete footing, a large amount of Granite rock needed to be removed. Hammering out this rock with a hydraulic breaker was not an option as it is much too hard, it had to be blasted. Dave was going to put on a helper for this job, however the excavator operator was not only an excellent machine operator, but he had done a lot of drill and blast works in years long past and was very keen to help out on blast days.
Please hit the like button and subscribe, that really helps.
Don't forget to follow us on Face Book and Instagram:
facebook.com/demolitiondaverockblasting
instagram.com/demolition.dave.blasting
https://www.demolitiondave.com.au
The 75 year old aqueduct needed to be replaced, the new design was a lot more sturdy and required a large concrete footing for several pre cast box culverts to sit on. In order to lay the concrete footing, a large amount of Granite rock needed to be removed. Hammering out this rock with a hydraulic breaker was not an option as it is much too hard, it had to be blasted. Dave was going to put on a helper for this job, however the excavator operator was not only an excellent machine operator, but he had done a lot of drill and blast works in years long past and was very keen to help out on blast days.
Please hit the like button and subscribe, that really helps.
Don't forget to follow us on Face Book and Instagram:
facebook.com/demolitiondaverockblasting
instagram.com/demolition.dave.blasting
https://www.demolitiondave.com.au










