Uploaded August 2022 | Updated September 2026, 3 weeks ago
Merkle Standard was kind enough to invite us out to see one of North America's first Bitcoin mine's running the S19 Hydro Water-Cooled Miner. These beast were rocking a 275TH Max with the average sitting around 250TH per unit at around 6200w. We walk you through the a recently acquired paper mill in Washington State where this mine is being setup at.
🎼 Background Audio
→ Inspiring Woodwinds by Orchestralis
💬 Links
Merkle Standard - merklestandard.com
👕 Check out the BitsBeTrippin merch, refresh in 2022
→ Coming Soon
🌎 Follow BitsBeTrippin everywhere
→ Twitch - twitch.tv/bitsbetrippin
→ Twitter - twitter.com/bitsbetrippin
#bitmain #bitcoin #s19hydro
Merkle Standard was kind enough to invite us out to see one of North America's first Bitcoin mine's running the S19 Hydro Water-Cooled Miner. These beast were rocking a 275TH Max with the average sitting around 250TH per unit at around 6200w. We walk you through the a recently acquired paper mill in Washington State where this mine is being setup at.
🎼 Background Audio
→ Inspiring Woodwinds by Orchestralis
💬 Links
Merkle Standard - merklestandard.com
👕 Check out the BitsBeTrippin merch, refresh in 2022
→ Coming Soon
🌎 Follow BitsBeTrippin everywhere
→ Twitch - twitch.tv/bitsbetrippin
→ Twitter - twitter.com/bitsbetrippin
#bitmain #bitcoin #s19hydro










