Uploaded March 2026 | Updated September 2026, 2 weeks ago
Thanks to the folks operating Making Tracks 3, we were able to take S160 2-8-0 'Big Jim' out on the main line (appropriately, Jim has OHLE warning flashes) with a rake of 16 coaches.
The S160 locomotives are currently going through the assembly process at the factory.
Thanks to the folks operating Making Tracks 3, we were able to take S160 2-8-0 'Big Jim' out on the main line (appropriately, Jim has OHLE warning flashes) with a rake of 16 coaches.
The S160 locomotives are currently going through the assembly process at the factory.










