Uploaded July 2026 | Updated November 2026, 3 hours ago
In each of our four underground stations giant ventilation systems need to not only draw warm air from the underground tunnels but also bring in fresh air from the outside 💨🚇 These highly complex ventilation systems also need to undergo a rigorous and extensive testing regime to check they will do everything they need to do once trains are in operation.
Here's a behind the scenes look at how the testing and commissioning process begins with their installation ⚙️🛠️
To find out more about testing and commissioning:
https://crossriverrail.qld.gov.au/about/testing-and-commissioning/
0:00 Stop, assess, fix it, start again - The steps of testing and commissioning
0:09 Commissioning Tunnel Ventilation System fans at Boggo Road station
0:21 Three main stages to commissioning TVS fans
0:37 Increasing the speed of the fans
0:58 Testing flow and pressure at different speeds
1:14 Taking measurements during the tests
More videos from Cross River Rail,
What is testing and commissioning? youtu.be/4D6_J-NVW24
Testing and commissioning videos: youtube.com/playlist?list=PLWhJ53ncUXhc
We acknowledge the Traditional Owners of this Country and the locations shown, and recognise the continuing connection to lands, waters and their communities.
We wish to pay our respects to the culture of our First Nations Peoples and to Elders past and present.
In each of our four underground stations giant ventilation systems need to not only draw warm air from the underground tunnels but also bring in fresh air from the outside 💨🚇 These highly complex ventilation systems also need to undergo a rigorous and extensive testing regime to check they will do everything they need to do once trains are in operation.
Here's a behind the scenes look at how the testing and commissioning process begins with their installation ⚙️🛠️
To find out more about testing and commissioning:
https://crossriverrail.qld.gov.au/about/testing-and-commissioning/
0:00 Stop, assess, fix it, start again - The steps of testing and commissioning
0:09 Commissioning Tunnel Ventilation System fans at Boggo Road station
0:21 Three main stages to commissioning TVS fans
0:37 Increasing the speed of the fans
0:58 Testing flow and pressure at different speeds
1:14 Taking measurements during the tests
More videos from Cross River Rail,
What is testing and commissioning? youtu.be/4D6_J-NVW24
Testing and commissioning videos: youtube.com/playlist?list=PLWhJ53ncUXhc
We acknowledge the Traditional Owners of this Country and the locations shown, and recognise the continuing connection to lands, waters and their communities.
We wish to pay our respects to the culture of our First Nations Peoples and to Elders past and present.