Behind the build: Meet Simran at Swan Draw Dock @BalfourBeattyBBplc
Behind the build: Meet Simran at Swan Draw Dock  @BalfourBeattyBBplc
Uploaded September 2026 | Updated September 2026, 1 day ago
Every career starts somewhere.

For Simran, it began with work experience at Balfour Beatty. Today, she’s a Site Engineer helping to deliver the Swan Draw Dock project.

In this edition of Behind the Build, Simran shares her early careers journey, the opportunities that have helped shape her career and what she enjoys most about working in construction.
Behind the build: Meet Simran at Swan Draw DockArmed Forces Covenant re-signing November 2024Scotlands first net-zero education building - The Dunfermline Learning Campus, Fife CollegeHelping the University of Strathclyde deliver net zeroHow do you lower a 5,000 tonne intake head into the Bristol Channel?Modern Methods of ConstructionSafely loading out the intake head for Hinkley Point C2024 Icon Awards - our partnersBehind the build: Meet Wayne at Painter BrothersDelivering social value on the A19 Norton to Wynyard schemeAffinity Network Spotlight - AbilityAlternative fuelled plant & vehicles live stream
Balfour Beatty |

Behind the build: Meet Simran at Swan Draw Dock

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER