Aurora 7 Processing and Launch Preparation (Silent Film, Uncorrected)  @ccspacemuseum
Aurora 7 Processing and Launch Preparation (Silent Film, Uncorrected)  @ccspacemuseum
Cape Canaveral Space Force Museum | Aurora 7 Processing and Launch Preparation (Silent Film, Uncorrected) @ccspacemuseum | Uploaded December 2020 | Updated October 2024, 15 hours ago.
Aurora 7 was the fourth Project Mercury human spaceflight. Astronaut Scott Carpenter was assigned to fly the mission.

This is a compilation of silent film clips showing delivery and preparation of the spacecraft, as well as training by Carpenter.

At about the 8:00 minute mark, the film in our archive was sped up. This version does not correct for this problem. The corrected version is at youtube.com/watch?v=F-IuwgmhbKs.

Visit our web site at www.afspacemuseum.org. We're on Twitter at @afspacemuseum.

DVD_0059UMATIC
Aurora 7 Processing and Launch Preparation (Silent Film, Uncorrected)Titan IV(401)B K-33 SRMU Core Vehicle Mate, SMARF   Day 2, May 17, 1997STS-61B Atlantis Launch, November 26, 1985Snark Launch and Landing, Unknown Date (Silent Film)Atlas Erection, Cape Canaveral Pad 36A, May 1, 1991Titan IV(402)B B-27 Engineering Stringout #2, Launch Complex 41, April 9, 1999Titan IV(402)B B-27 Engineering Stringout #1, Launch Complex 41, April 9, 1999STS-51I Discovery Launch, August 27, 1985Redstone Arsenal: A Tradition of ExcellenceTitan IV(401)B K-33 Cassini Composite Tapes, Aug - Sep 1997Atlas II AC-106 USA-97 (DSCS IIIB-10) Engineering Stringout (1993)Titan IV(401)B K-33 Centaur Cassini Spacecraft Flow, Mar - Jun 1997

Aurora 7 Processing and Launch Preparation (Silent Film, Uncorrected) @ccspacemuseum

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER