Astro-skeleton, Strike trains finished, less control mechanisms @MarkFrankclocks
Astro-skeleton, Strike trains finished, less control mechanisms  @MarkFrankclocks
Uploaded September 2020 | Updated September 2026, 2 weeks ago
This video shows the completed and final finished strike trains on a turntable to show the various components. This is only the quarter and hour drive trains with the bell hammers; less any of the complex strike control mechanisms - the levers, racks, cams, detents and fly governors. Even though this module contains two trains, it is the least complex, on a stand-alone basis of the other two main train modules, the time and celestial trains. To be fair many of its components are shared with the celestial train and if one were to be able to attach all the control and synchronization transfer mechanisms to the strike trains module while outside of the machine (which is not possible), the answer would be different. In all there are four trains contained within three modules that sit upon the flat bed base containing four spring barrels.
Astro-skeleton, Strike trains finished, less control mechanismsOliver Pillard model #3, New Britain Bank Lock Co., 1875. Demonstration video.Atlas orrery clockYale Type B time lock, 1888, winding and settingAstro-skeleton, fabrication of decorative winding barrel arbor rosettesFrench orrery mantle clockAstro-skeleton, Locating jig for keyway holesConsolidated Time Lock Co., Benjamin Flint model time lockAstro-skeleton, mean time, sidereal time demoAstro-skeleton as of May 2018Astro-skeleton, Reassembly of the time trainAtlas clock, the celestial sphere
Mark Frank |

Astro-skeleton, Strike trains finished, less control mechanisms

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER