Nuclear Regulatory Commission Incompetent! Not having the necessary skills to do something successfully.
incapable - unfit - unable - inefficient - unqualified

DEJA VU ALL OVER AGAIN!
In this Sunday's podcast, Fairewinds' Arnie Gundersen discusses two recent safety equipment failures at operating nuclear plants in the United States. Just this week, a containment failure in New York State and an emergency cooling water failure in Tennessee prove yet again that Fairewinds previous analyses of nuclear plant weaknesses are correct. Arnie also discusses how containments are leak tested and how the NRC allows those containment leak tests to be manipulated.
fairewinds.org/content/deja-vu-all-over-again
Thus, like going to a dentist to have a cavity filled. Dentist repairs cavity, then tests to see if you have a cavity... and they can say "no- no cavity, you're fine" kind of analogy.

the NRC Reports associated with "events" posted daily here:
nrc.gov/reading-rm/doc-collections/event-status

among today's topics, Arnie discusses 9 Mile Point BWR (like the reactor at Fukushima Daiichi - you know... the ones in full meltdown). The Fitzpatrick nuclear power plant. Yes, also like the Fukushima Daiichi meltdowns. A 4 inch crack inside containment with rust dripping out. Not Tested to check for containment until After the crack was repaired.
Beaver Valley - a 2 inch hole inside the containment. Again, the NRC did not check containment before the hole was repaired. In Virginia, and again in Florida - Turkey Point, leaks in containment. May I just say, if there is a leak in containment, it is NOT CONTAINED.
Next, Arnie discusses loss of ultimate heat sync - again ignored by the NRC.
The Sequoia plant in Tennessee - emergency raw cooling water to diesels - building not water tight and the water could overwhelm the service water pumps.
2 NRC dudes per 1000 workers... the workers are expected to self report problems in a nuclear plant. As we've heard over and over again, the workers are also threatened if they Do reveal a problem, so it's kind of a catch 22.
The design basis for flood was to the OLD basis standards, too. The NRC is ignoring flooding of the cooling pumps designed to cool the reactors.

Tomorrow (Monday), Fairewinds is making a new video presentation on the detonation shock wave, etc.
Arnie Gundersen: NRC INCOMPETENT Reporting Nuclear ProblemsFukushima Radioactive Waste heads to National Forest. Japan update 9/27/12Arnie Gundersen: Nuclear Powers 70th Anniversary (Then & Now)Fukushima Important Update 10/19/12 this is NOT a DRILL!Nuclear update Fukushima, United States, & World. 8/13/12 Its WAR.Welcome to MsMilkytheclown & MsMilkytheclown1Japan Predicts Major Earthquake & Tsunami in future: Fukushima update 10/18/12Fukushima Radioactive Fallout Forecast for 10 Years & update 7/21/12Fukushima Zirc Fires at SFP#4 AND SFP#3 Cover-up by NRC! Plume-Gate in the USAArnie Gundersen: Mothball Fukushima Reactors for 100 YEARSFukushima Inspect Fuel Rods from SFP#4, More Radioactive Water Storage & Update 8/28/12TEPCOs Independent Panel My Aching A$$ Dale Klein Exposed