Uploaded July 2013 | Updated September 2026, 2 weeks ago
The Grid 44 Foundations Continue: Two more weeks of excavation in our new grid have revealed numerous artifacts and foundations. There appear to be at least two building use phases (rebuilt structures) exposed. A stone flagstone floor and drain is partially preserved outside the building, and a mosaic floor on the inside.
The Grid 44 Foundations Continue: Two more weeks of excavation in our new grid have revealed numerous artifacts and foundations. There appear to be at least two building use phases (rebuilt structures) exposed. A stone flagstone floor and drain is partially preserved outside the building, and a mosaic floor on the inside.