Uploaded February 2018 | Updated November 2026, 1 day ago
Subscribe to our channel for the latest training videos, climbing tutorials and more! In this video we review additional commands, specific to partner communication while aid and big wall climbing.
Aiding Command #1: When the lead climber reaches the anchor, builds a bomber (i.e. 100% secure) anchor, and fixes the main rope, they will yell down to the belayer, “Line is fixed!”
“Fixed line” means the climbing rope is attached to an equalized anchor, and the second climber can begin jugging up—once the haul bag is freed from the lower anchor.
Aiding Command #2: Once the leader has fixed the climbing line on the upper anchor, the leader pulls up any slack in the haul line, and sets up the haul system. The rope should be taut on the haul bags below. When this is ready, the leader will yell down to the belayer, “Ready to Haul!”.
The belayer then carefully detaches the haul bag(s) from the anchor, before they start to jug up the climbing line—just in case anything goes wrong.
Suggested Aiding Commands for the Belayer:
1. Let the leader know when they have passed the halfway point on the rope. If you are not using a tag line, this will be the leader’s last chance to lower a loop of rope and pick up extra gear for leading.
2. It is also nice for the belayer to alert the leader of how much rope they have left to finish leading the pitch. Yell something like “thirty feet of rope!” when there is only 30 feet of rope left, so the leader is aware that it's time to start looking for a spot to build an anchor. You don’t want to run out of rope in the middle of nowhere.
Suggested Aiding Commands for the Leader:
1. A leader often states “Watch me” when moving through a series of dicey aid placements. This way the belayer is extra attentive.
2. If transitioning from aid climbing to free climbing, the leader might say “Going Free!!”, or “Hey I’m gonna bust some free moves for a few feet, make sure to feed me enough rope.” At that point the leader will be moving more like a rabbit than a tortoise, and the last thing they want is to be short-roped (i.e. rope too tight) by an inattentive belayer.
3. The leader should also try to alert the belayer when they are close to the anchor. This allows the belayer to start cleaning up the anchor, close up the haul bag, put away the portaledge. This will save time, once the leader is safely off-belay and ready to begin the process of hauling.
Considerations for Aiding Efficiencies:
Once the leader reaches the end of the pitch, there are numerous ways to set an anchor to facilitate organization and transitions. For more on this see our videos on “Building Traditional Anchors” and “Alternative Trad Anchors”.
Ideally you will create two separate, equalized master points at the anchor. One master point is for the follower’s fixed rope, and one is for the haul line. As with all outdoor adventures, things may not line up with your ideal, so some flexibility of skills may be required.
We hope you found this video helpful.
Please remember, climbing is inherently dangerous. Climb at your own risk. Visit ClimbingTechTips.com for related comments, additional videos, and community feedback!
Subscribe to our channel for the latest training videos, climbing tutorials and more! In this video we review additional commands, specific to partner communication while aid and big wall climbing.
Aiding Command #1: When the lead climber reaches the anchor, builds a bomber (i.e. 100% secure) anchor, and fixes the main rope, they will yell down to the belayer, “Line is fixed!”
“Fixed line” means the climbing rope is attached to an equalized anchor, and the second climber can begin jugging up—once the haul bag is freed from the lower anchor.
Aiding Command #2: Once the leader has fixed the climbing line on the upper anchor, the leader pulls up any slack in the haul line, and sets up the haul system. The rope should be taut on the haul bags below. When this is ready, the leader will yell down to the belayer, “Ready to Haul!”.
The belayer then carefully detaches the haul bag(s) from the anchor, before they start to jug up the climbing line—just in case anything goes wrong.
Suggested Aiding Commands for the Belayer:
1. Let the leader know when they have passed the halfway point on the rope. If you are not using a tag line, this will be the leader’s last chance to lower a loop of rope and pick up extra gear for leading.
2. It is also nice for the belayer to alert the leader of how much rope they have left to finish leading the pitch. Yell something like “thirty feet of rope!” when there is only 30 feet of rope left, so the leader is aware that it's time to start looking for a spot to build an anchor. You don’t want to run out of rope in the middle of nowhere.
Suggested Aiding Commands for the Leader:
1. A leader often states “Watch me” when moving through a series of dicey aid placements. This way the belayer is extra attentive.
2. If transitioning from aid climbing to free climbing, the leader might say “Going Free!!”, or “Hey I’m gonna bust some free moves for a few feet, make sure to feed me enough rope.” At that point the leader will be moving more like a rabbit than a tortoise, and the last thing they want is to be short-roped (i.e. rope too tight) by an inattentive belayer.
3. The leader should also try to alert the belayer when they are close to the anchor. This allows the belayer to start cleaning up the anchor, close up the haul bag, put away the portaledge. This will save time, once the leader is safely off-belay and ready to begin the process of hauling.
Considerations for Aiding Efficiencies:
Once the leader reaches the end of the pitch, there are numerous ways to set an anchor to facilitate organization and transitions. For more on this see our videos on “Building Traditional Anchors” and “Alternative Trad Anchors”.
Ideally you will create two separate, equalized master points at the anchor. One master point is for the follower’s fixed rope, and one is for the haul line. As with all outdoor adventures, things may not line up with your ideal, so some flexibility of skills may be required.
We hope you found this video helpful.
Please remember, climbing is inherently dangerous. Climb at your own risk. Visit ClimbingTechTips.com for related comments, additional videos, and community feedback!








![Alpine & Mountaineering: 1. Ice Axe Positions | Climbing Tech Tips
Subscribe to our channel for the latest training videos, climbing tutorials and more! In this video we review considerations for ice axe positions. The ice axe is the symbol of mountaineering. When used correctly, it can be one of the most versatile tools a climber employs in the mountains.
There are many ways the ice axe is used and held to help climbers with ascending and descending snow and ice. When and where to choose these different hand positions depends on:
- Ability and/or desired security
- Firmness of the snow
- Steepness of the slope
- Consequences of a slip and fall
Below are the various ice axe positions used in alpine & mountaineering:
Cane - On relatively flat terrain, or with gentle slopes such as glaciers and snowfields, its best to use the axe in the “cane position.” As it sounds, hold the axe on top of the head, with fingers wrapped around the pick and the adze. The shaft and the spike are placed on the mountain surface, and the whole tool is used like a walking cane.
Self Arrest - The classic “self arrest” position is similar to the cane position, but the axe is always held in the uphill hand with the adze facing forward. This position helps you swiftly self arrest while climbing. Please see our other video on “The Self-Arrest].
Dagger - When the terrain gets steeper and firmer such as with neve snow, climbing using the “dagger” position is a secure and speedy technique. The axe can be held just under the head on the shaft, or with fingers wrapped around the head, with the adze resting in the saddle between the thumb and pointer finger and the pick facing into the slope. Plunge the pick into the snow and keep the lower part of the shaft flat against the slope, then move your feet up and repeat.
Belay - On steep, softer snow, the ice axe “belay” position can offer very secure climbing. Hold the axe on the head, one hand on the pick, and the other had on the adze. Plunge the shaft of the axe as far as you can in the snow to create a fairly solid anchor. Then move the feet up and repeat.
Hammer - Finally, the “hammer position” is most often used with vertical ice climbing tools or a set of ice axes in very steep snow or ice. Hold the axe low on the shaft just above the spike. Drive the pick of the axe into the slope using a hammer swinging motion over your head.
Note:
In this Alpine & Mountaineering video series section, we discuss carrying only one ice axe. It is therefore called an ice axe. A “piolet” is a more technical form of ice axe, which is sort of a hybrid of the two axe types used on many alpine routes. Once we enter into our Ice Climbing video series, notice how we describe waterfall ice axes (typically used as a pair) as “ice tools”, and not ice axes. Pedantic, but correct!
We hope you found this video helpful.
Please remember, climbing and mountaineering inherently dangerous. Climb at your own risk. Visit https://ClimbingTechTips.com for related comments, additional videos, and community feedback! Alpine & Mountaineering: 1. Ice Axe Positions | Climbing Tech Tips](https://i.ytimg.com/vi/6TtDf1DD_ig/mqdefault.jpg)

