After the Floods: The Race to Rebuild Cow Creek Bridge @TxDOT
After the Floods: The Race to Rebuild Cow Creek Bridge  @TxDOT
Uploaded November 2025 | Updated September 2026, 1 day ago
After catastrophic flooding destroyed the RM 1431 bridge over Cow Creek, TxDOT’s Austin District employees designed and delivered a resilient replacement structure in record time. TxDOT and contractor teams worked together under an accelerated project timeline—sometimes around the clock and despite challenging terrain—to build a taller, wider, and safer crossing. The result was a modern, durable bridge open to the public just 29 days from the start of construction and 45 days from the washout — restoring a vital connection between the Lago Vista and Marble Falls communities. This video was originally created for the 99th annual Transportation Short Course / Teamwork: Building Together.
After the Floods: The Race to Rebuild Cow Creek Bridge2025 TSQC Meeting  - Built-up Press-brake Formed Tub GirdersTexas Innovation Alliance April 23, 2025Exploring and Developing Innovative Methods for Estimating VMT on Local Roads in Texas 0-7187Drive like a Texan: Donna ShaverDeploying innovation: Wrong Way Driving CountermeasuresQuantify Maximum Accumulated Seal Coat Layers for Stability 0-7106Maneja como un tejano: Donna ShaverSPM8 - The Query TabMines Road (FM 1472) Segment 1 - Prerecorded Video PresentationLeveraging Probe-Based Data to Enhance Long-Term Planning Models 0-7166US 59 Loop Upgrade to Freeway ROW expansion & Utility relocations - Laredo, Tx. April 2025
TxDOT |

After the Floods: The Race to Rebuild Cow Creek Bridge

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER