Uploaded May 2024 | Updated September 2026, 1 week ago
The team is back into long duration Aeon R engine testing, firing at 100% power for 180 seconds, which is the maximum duration for a Terran R first stage flight plus margin. 🚀
This accomplishment demonstrates the capability of the engine system, the infrastructure required to build and operate a new engine of this class, and the dedication of the teams responsible for executing each step of the process — unlocking key learnings to test and qualify flight-ready engines.
🚀 bit.ly/RelativitySpaceCareers
Shop our merch: bit.ly/relativitystore
Follow on social:
Instagram: instagram.com/relativityspace
Threads: threads.net/@relativityspace
X: twitter.com/relativityspace
LinkedIn: linkedin.com/company/relativity
Facebook: facebook.com/relativityspace
#rockets #engineering #engineering #fire #nasa #engine
The team is back into long duration Aeon R engine testing, firing at 100% power for 180 seconds, which is the maximum duration for a Terran R first stage flight plus margin. 🚀
This accomplishment demonstrates the capability of the engine system, the infrastructure required to build and operate a new engine of this class, and the dedication of the teams responsible for executing each step of the process — unlocking key learnings to test and qualify flight-ready engines.
🚀 bit.ly/RelativitySpaceCareers
Shop our merch: bit.ly/relativitystore
Follow on social:
Instagram: instagram.com/relativityspace
Threads: threads.net/@relativityspace
X: twitter.com/relativityspace
LinkedIn: linkedin.com/company/relativity
Facebook: facebook.com/relativityspace
#rockets #engineering #engineering #fire #nasa #engine










