Uploaded December 2020 | Updated November 2026, 1 day ago
Advanced Reactor Licensing of KP-FHR is covered by Peter Hastings, who is Kairos Power's VP of Regulatory Affairs & Quality. kairospower.com
Pre-Application Engagement Status
• 18 technical or topical reports or revisions
• Pilot of “no-RAI” review
• Multiple audits, onsite reviews (including PIRT acceptance)
• NRC approvals:
• Principal Design Criteria
• Test Scaling Methodology
• Salt Coolant Qualification
• Licensing Basis Event Selection (draft)
• ACRS review of Test Scaling and Salt topicals (LBE pending)
• Under review:
• Regulatory Gap Analysis
• Fuel Performance
• QA Program
• High-Temp Metallic Materials • Mechanistic Source Term
• Fuel Qualification
ThoriumRemix.com Thorium & MSR & Nuclear assets used in Thorium Remix project.
Advanced Reactor Licensing of KP-FHR is covered by Peter Hastings, who is Kairos Power's VP of Regulatory Affairs & Quality. kairospower.com
Pre-Application Engagement Status
• 18 technical or topical reports or revisions
• Pilot of “no-RAI” review
• Multiple audits, onsite reviews (including PIRT acceptance)
• NRC approvals:
• Principal Design Criteria
• Test Scaling Methodology
• Salt Coolant Qualification
• Licensing Basis Event Selection (draft)
• ACRS review of Test Scaling and Salt topicals (LBE pending)
• Under review:
• Regulatory Gap Analysis
• Fuel Performance
• QA Program
• High-Temp Metallic Materials • Mechanistic Source Term
• Fuel Qualification
ThoriumRemix.com Thorium & MSR & Nuclear assets used in Thorium Remix project.










