Uploaded November 2026 | Updated November 2026, 3 hours ago
The GT50 has completed 55 test runs in the cell at PC1 and reached 85.8% N1. When the longest run ended, the borescope went in, and the engine still looked new inside.
Jason takes us once more across PC1. Engine testing on one side. The HX50 structure moving through the composite and machine shops on the other.
What is in this update:
- 55 runs and about 10.5 hours in the cell, and why the hours are short on purpose
- Combustion now at almost 100%, with stable running
- FADEC taking over start and shutdown, and the plan to run the engine as a self-contained unit
- Replacing the initial safety nozzles with in-house, high-bandwidth nozzles
- Modifications to the test cell for sustained running
- The Gen Two fuselage, and a rear structure now frozen and released to manufacture
- 19 patterns, tools and moulds, and the first parts coming off them
- Wheeled and skid undercarriage, and the combined SAS and autopilot actuators
- 17 prototype rotor blades, and a crew seat that took three attempts
- Why attention has now shifted back to getting the aircraft into the air
Chapters:
0:00 Inside the GT50 test cell
0:39 55 runs, 85.8% N1, clean borescope
2:24 Combustion close to 100%
4:06 FADEC takes over start and shutdown
4:45 Replacing the safety nozzles
8:24 The Gen Two fuselage
10:33 19 patterns, tools and moulds
13:36 Wheeled undercarriage
16:14 Skid undercarriage
18:48 SAS and autopilot actuators
22:09 Rotor blades
23:05 Crew seat
27:44 Back to the aircraft
Discover more ► hillhelicopters.com
The GT50 has completed 55 test runs in the cell at PC1 and reached 85.8% N1. When the longest run ended, the borescope went in, and the engine still looked new inside.
Jason takes us once more across PC1. Engine testing on one side. The HX50 structure moving through the composite and machine shops on the other.
What is in this update:
- 55 runs and about 10.5 hours in the cell, and why the hours are short on purpose
- Combustion now at almost 100%, with stable running
- FADEC taking over start and shutdown, and the plan to run the engine as a self-contained unit
- Replacing the initial safety nozzles with in-house, high-bandwidth nozzles
- Modifications to the test cell for sustained running
- The Gen Two fuselage, and a rear structure now frozen and released to manufacture
- 19 patterns, tools and moulds, and the first parts coming off them
- Wheeled and skid undercarriage, and the combined SAS and autopilot actuators
- 17 prototype rotor blades, and a crew seat that took three attempts
- Why attention has now shifted back to getting the aircraft into the air
Chapters:
0:00 Inside the GT50 test cell
0:39 55 runs, 85.8% N1, clean borescope
2:24 Combustion close to 100%
4:06 FADEC takes over start and shutdown
4:45 Replacing the safety nozzles
8:24 The Gen Two fuselage
10:33 19 patterns, tools and moulds
13:36 Wheeled undercarriage
16:14 Skid undercarriage
18:48 SAS and autopilot actuators
22:09 Rotor blades
23:05 Crew seat
27:44 Back to the aircraft