Uploaded September 2024 | Updated September 2026, 2 weeks ago
A drive on the complete stretch of Mumbai Coastal Road (South phase), from Marine Drive to Bandra; covering approximately 14km in 12 minutes via the newly opened Bowstring Arch Bridge connector.
๐ฅ contact@anujn.com
Time of day: 8AM
Recorded in September 2024.
00:00 Marine Drive
01:31 Tunnel
04:54 Breach Candy
06:13 Haji Ali
07:32 Worli
09:15 new stretch
10:08 Sea Link
A drive on the complete stretch of Mumbai Coastal Road (South phase), from Marine Drive to Bandra; covering approximately 14km in 12 minutes via the newly opened Bowstring Arch Bridge connector.
๐ฅ contact@anujn.com
Time of day: 8AM
Recorded in September 2024.
00:00 Marine Drive
01:31 Tunnel
04:54 Breach Candy
06:13 Haji Ali
07:32 Worli
09:15 new stretch
10:08 Sea Link










