Uploaded June 2015 | Updated November 2026, 2 hours ago
Ride in the cab of K-36 number 489 from Antonito westbound on the passenger train to Sublette, some 26 miles. You will see just about everything that was shot on this ride, including the engineer working the engine, the fireman shoveling coal, with most views looking down the side of the engine forward from the fireman's seat. This is the fastest section of Cumbres and Toltec trackage, and then we begin the long climb from the San Luis valley through Whiplash Curve, Big Horn, and more. See taking water at Sublette and a special stop along the way(Unscheduled). The stack talk is nice and is mesmerizing to hear for such a long time. Available in SD or Blu-Ray. There is about 7 minutes of this cab ride in the Riding The C&TS video, but this video shows the entire cab ride.
Ride in the cab of K-36 number 489 from Antonito westbound on the passenger train to Sublette, some 26 miles. You will see just about everything that was shot on this ride, including the engineer working the engine, the fireman shoveling coal, with most views looking down the side of the engine forward from the fireman's seat. This is the fastest section of Cumbres and Toltec trackage, and then we begin the long climb from the San Luis valley through Whiplash Curve, Big Horn, and more. See taking water at Sublette and a special stop along the way(Unscheduled). The stack talk is nice and is mesmerizing to hear for such a long time. Available in SD or Blu-Ray. There is about 7 minutes of this cab ride in the Riding The C&TS video, but this video shows the entire cab ride.










