2018.4.5 Unit 1 Rubble Removal @OfficialTEPCOen
2018.4.5 Unit 1 Rubble Removal  @OfficialTEPCOen
Uploaded April 2018 | Updated November 2026, 3 days ago
(03: 09) ■ TEPCO HEADLINE ■Work to remove rubble on top of the Unit 1 reactor building at Fukushima Daiichi is underway in preparation to remove fuel from the spent fuel pool. One of our team of decommissioning experts explains what’s being done, the different types of equipment being used to remove the rubble safely, and the measures being taken in consideration of the surrounding environment.
2018.4.5 Unit 1 Rubble Removal2015.10.15 Fuel Removal Roof Cover Installation on Unit 3 at Fukushima DaiichiTEPCO Shorts  ALPS treated water #02 What about tritium that can’t be removed with ALPS?2018.2.7 Examining the bottom of the containment vessel -Unit 2 Internal Investigation-【Unit3 SFP 2012 9 24】Investigation of the inside of Unit 3 spent fuel pool,Fukushima Daiichi ②2016.3.31 Completion of the Landside Impermeable WallDEC1%20test1%201080p HDA One Year Review of Fukushima DaiichiThe discharge of ALPS treated water into the seaSurvey on the inside of Unit 3 Spent Fuel Pool surfaceVideo explaining the Frozen Pipe Method at Fukushima Daiichi NPSAiming for carbon neutrality through hydrogen and electrification
OfficialTEPCOen |

2018.4.5 Unit 1 Rubble Removal

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER