Uploaded May 2018 | Updated November 2026, 4 days ago
With just 5 weeks before flying to France, there's still a lot left to do getting the trike built! Here we are looking at what needs to be done for fitting two All Axle hub motors to drive the front wheels of the tandem trike.
There isn't much of a standard for single side wheel mounts on tricycles, but this Terratrike uses a 20mm hollow spindle which is about as ideal as we could hope for. With a few custom machining operations on the axle we should be able to fabricate some custom hubs that will slide right on with the electrical cable passing through the hollow axle.
Both the modified axle and the anti-rotation tube are currently out for anodizing and should be at Grin next week to complete the motor builds.
With just 5 weeks before flying to France, there's still a lot left to do getting the trike built! Here we are looking at what needs to be done for fitting two All Axle hub motors to drive the front wheels of the tandem trike.
There isn't much of a standard for single side wheel mounts on tricycles, but this Terratrike uses a 20mm hollow spindle which is about as ideal as we could hope for. With a few custom machining operations on the axle we should be able to fabricate some custom hubs that will slide right on with the electrical cable passing through the hollow axle.
Both the modified axle and the anti-rotation tube are currently out for anodizing and should be at Grin next week to complete the motor builds.










