Uploaded June 2026 | Updated September 2026, 1 week ago
Learn more about the Tormach 1500MX hubs.ly/Q03Yb5mb0 - powered by our free PathPilot® software hubs.ly/Q03Yb4tk0.
This video is an update to our 1500MX Installation video. The pallet and crate have been redesigned and there are new steps to disassemble it. In addition the enclosure has been redesigned to improve coolant evacuation.
We have divided this video into two parts. We are strongly suggesting that the installation of the enclosure panels are to be started at the beginning of the second day. If you stop halfway through the Sikaflex will cement the panels in place and you won't be able to align them.
You can go to Part One by clicking on this link: youtu.be/YuDk5aJk9Qs
Intro 00:00
Starting the Enclosure Installation 00:41
Installing the Chip Trays 3:03
Installing the Enclosure Panels 5:36
Cleaning the Sikaflex 12:47
Installing the Door 13:39
Installing Door Switch 19:08
Installing Op Console 20:29
Installing Kickplate 23:40
Setting up Coolant Tank and Pump 12:29
Install Y-Axis Washdown 30:58
Flood Coolant Install 32:44
Install MQL 41:48
Interested in a Tormach machine? Schedule a call with one of our team members at hubs.ly/Q029gf-H0 and they will be happy to answer any questions you have.
Be sure to subscribe for updates on everything Tormach: goo.gl/sWeCs7
Join the Tormach Forums here: hubs.ly/Q029ggRV0
There are several ways to contact Tormach Technical Support.
If you want technical support, please follow these instructions to open a support ticket: hubs.ly/Q029ghcD0
Tormach Technical Support page: hubs.ly/Q029ghwW0
Tormach Technical Support contact: tormach.atlassian.net/servicedesk/customer/portals
About Us: At Tormach, we're dedicated to providing exceptionally engineered products, technical support, and customer service at the lowest possible cost. Our focus is to help you realize your CNC goals through tools and resources that transform your concepts into real products. Connect with us:
Visit our website: hubs.ly/Q029gj8M0
Learn more about the Tormach 1500MX hubs.ly/Q03Yb5mb0 - powered by our free PathPilot® software hubs.ly/Q03Yb4tk0.
This video is an update to our 1500MX Installation video. The pallet and crate have been redesigned and there are new steps to disassemble it. In addition the enclosure has been redesigned to improve coolant evacuation.
We have divided this video into two parts. We are strongly suggesting that the installation of the enclosure panels are to be started at the beginning of the second day. If you stop halfway through the Sikaflex will cement the panels in place and you won't be able to align them.
You can go to Part One by clicking on this link: youtu.be/YuDk5aJk9Qs
Intro 00:00
Starting the Enclosure Installation 00:41
Installing the Chip Trays 3:03
Installing the Enclosure Panels 5:36
Cleaning the Sikaflex 12:47
Installing the Door 13:39
Installing Door Switch 19:08
Installing Op Console 20:29
Installing Kickplate 23:40
Setting up Coolant Tank and Pump 12:29
Install Y-Axis Washdown 30:58
Flood Coolant Install 32:44
Install MQL 41:48
Interested in a Tormach machine? Schedule a call with one of our team members at hubs.ly/Q029gf-H0 and they will be happy to answer any questions you have.
Be sure to subscribe for updates on everything Tormach: goo.gl/sWeCs7
Join the Tormach Forums here: hubs.ly/Q029ggRV0
There are several ways to contact Tormach Technical Support.
If you want technical support, please follow these instructions to open a support ticket: hubs.ly/Q029ghcD0
Tormach Technical Support page: hubs.ly/Q029ghwW0
Tormach Technical Support contact: tormach.atlassian.net/servicedesk/customer/portals
About Us: At Tormach, we're dedicated to providing exceptionally engineered products, technical support, and customer service at the lowest possible cost. Our focus is to help you realize your CNC goals through tools and resources that transform your concepts into real products. Connect with us:
Visit our website: hubs.ly/Q029gj8M0