Danny KimFunctional cardboard chair and writing desk. Industrial design case study of natural laws of form evolving from function and structure. The chair's components require a functional back, armrests, portablitly under 24" x 16" x 12", a minimal seat height of 12", minimal dynamic load of 180 pounds, an optional desk that supports 20 lbs on a 11" x 8 1/2" writing area. Optional refolded portability. no cuts, no glue, no tape, only folds. Designed @ RISD.
RISD Ken Horii’s 3D foundations - Cardboard Chair + Desk, One Sheet, No cuts, No glue, Only Folds.Danny Kim2006-04-30 | Functional cardboard chair and writing desk. Industrial design case study of natural laws of form evolving from function and structure. The chair's components require a functional back, armrests, portablitly under 24" x 16" x 12", a minimal seat height of 12", minimal dynamic load of 180 pounds, an optional desk that supports 20 lbs on a 11" x 8 1/2" writing area. Optional refolded portability. no cuts, no glue, no tape, only folds. Designed @ RISD.1086 Folsom stDanny Kim2019-04-03 | ...Abbey Rizzle BlizzleDanny Kim2010-10-29 | Hella Robins Yo.PoMo ScooterDanny Kim2010-02-17 | PoMo is a prototype production urban scooter made for carrying cargo for everyday errands in the city. Developed by Danny Kim, Designed by Elliot Ortiz, Fabricated by Zach Levenberg.Welding TitaniumDanny Kim2009-06-22 | Gold Gilded titanium Bike
http://www.flickr.com/photos/64836237@N00/sets/72157621228288219
maiden voyage
http://www.youtube.com/user/dannykim8379#p/u/1/FqHStgmNnKATyler Ti Maiden VoyageDanny Kim2009-06-22 | After three months of anticipation, a friend of mine rides his custom Gilded Gold Titanium bike on its maiden voyage. Location central park. Made by Danny KimRIsd commuter conceptDanny Kim2009-05-29 | ...BIo diesel Land Rover snow driftDanny Kim2009-03-02 | Snowy day went out for a quick drive.Brazing Columbus Steel bicycle frameDanny Kim2009-02-16 | Brazing the seat post inserts for my carbon seat stays.HS 2.8L TGV Diesel Land Rover Defender 110 - Final assemblyDanny Kim2008-09-17 | Throughout the 2 year, 13,031 mile working prototype test period, all mechanical bugs and vehicle character flaws have been identified and resolved in the production model.
D-90 build flickr.com/photos/64836237@N00/albums/72157608691592540Tesla coil encounterDanny Kim2007-08-17 | Yup. Ouch.CabbageDanny Kim2007-06-01 | Sami and Q eat cabbageAmazing Guitar RamblinDanny Kim2006-11-14 | Josh plays a quick song he wrote.Sand lake oregonDanny Kim2006-08-27 | just putting aroundRancho Del Kim River movieDanny Kim2006-08-18 | Preview at Rancho Del Kim Movie screen suspended over the riverTillamookDanny Kim2006-08-18 | bamboo dome Tillamook Rancho Del Kim Party Built by three RISD StudentsBuilding da Dome In Tillamook, ORDanny Kim2006-08-11 | debating if we shold burn the dome.defender 2.8 tgvDanny Kim2006-07-10 | my dad mowing the some weeds in the back yard.Bio-diesel 2.8 TGV Defender 90 platform (Skinned)Danny Kim2006-05-14 | DIY Biodiesel Perfect SUV, 90" wheelbase for city parking, Re-engineered lower center of gravity and suspension for improved road manners, Imported and adapted Brazilian TDI 28mpg, Reclaimed body/interior to preserve embodied energy, pneumatic traction devices for all weather condition.