Shop addition update, Foundation pour, Pad pour. I get the concrete floor poured and the approach apron poured. This will finish up the concrete work for the shop addition.
The shop addition is progress well and at an even pace. I am building a 16 ft deep by 28 ft wide with 10 ft ceiling, addition to the end of my existing shop. My current shop is 40 deep by 28 ft wide with 8 ft ceiling.
The addition will house most of my metal working equipment, isolated from the wood working area of the shop.
🎯Connect with me on Patreon: patreon.com/user?u=27829708
🎯Subscribe: youtube.com/user/Catfish6945?sub_confirmation=1
🎯Follow me On Instagram: instagram.com/rrintheshop
🎯Dovetail Cutter and Scribe info: Email To:
RRINTHESHOP@GMAIL.COM
Shop addition update, Foundation pour, Pad pour. I get the concrete floor poured and the approach apron poured. This will finish up the concrete work for the shop addition.
The shop addition is progress well and at an even pace. I am building a 16 ft deep by 28 ft wide with 10 ft ceiling, addition to the end of my existing shop. My current shop is 40 deep by 28 ft wide with 8 ft ceiling.
The addition will house most of my metal working equipment, isolated from the wood working area of the shop.
🎯Connect with me on Patreon: patreon.com/user?u=27829708
🎯Subscribe: youtube.com/user/Catfish6945?sub_confirmation=1
🎯Follow me On Instagram: instagram.com/rrintheshop
🎯Dovetail Cutter and Scribe info: Email To:
RRINTHESHOP@GMAIL.COM