Started with the cheek walls, got the three basic cords in place then filled in the studs. Tied the cheek walls into the gable walls with the top plates and filled in the cheek wall double top plates. Put in Californian corners for the eventual drywall. Next we placed the ridge beams and cut the common rafters.
Barge rafters will go last when I put the sub-facia on.
The most challenging part remains, the intersection between the main roof ~45 degree slope and the ~12 degree dormer pitch. There won't be much valley which I am sure will be annoying as hell to shingle. The flashing has to be quite carefully done and I am not 100% sure how I will vent the cripple rafter region before the dormer wall yet. Also not sure if I will go with a conventional valley yet which is more compact than a California plate valley. Anyway, once I work all that out I'll do a bunch of blocking on the main gables then some sheathing and wrap on the walls and it will be ready to roof and dry-in.
Finished up the cripple rafters for the north wall between the dormer gable wall and the north wall including the overhang. Similar to the south wall, this was done by placement of a full rafter, marking the dormer wall stud and double-checking the slope of the cripple rafter before it was fastened.
Did the basic layout for one cheek wall - the other three should be basically identical, but I will field measure each tomorrow... well at least try dry fitting the three mains cords established today before cutting their own.
Then I can tie the walls all together with the top plates. Work out the valley rafters, place all the cripples to the valleys, place the ridge beam and do the rafters! I think the gable overhang will be simply hung from the ridge and plate extensions with some tack-on look-outs, the span isn't very long, neither is the overhang so it isn't very demanding structurally.
Richard was available again to help, so we got the basic gable-end dormer walls done. Camera went flat at the end unfortunately. Not much was lost, just the placement of the cripple rafters on the south wall.
Started with the rafters including the doubled ones and an extra spaced to support the cheek walls.
Then the framing of the gable base walls with the window openings.
Finally before the light faded the cripple rafters between the dormer wall and the south wall overhang.
Spent most of the day doing other things, like moving lumber and mowing the lawn around all the junk on this side of the yard using an olde school manual push mower - my lats will be unhappy by Tuesday!
Rather than get too into dormer framing I decided to spend the last few hours of daylight moving the stairs to their final location and building the north pony wall. This involved replacing the oversized and thin-gauge connector plates holding the post to the beam with something more appropriate, then trimming the mid-span beam to length so the stair stringer could sit flush against the doubled rim joist and floor beam.
Once the stairs were moved it was time to build the pony wall to match the landing. Then I replaced the temporary top stair tread with a full-sized one that caps the top of the stringers. The 2nd top step had a nasty looking knot in it so I replaced it also with the temporary top step (it was structurally sound, just looked kinda ugly) .
Richard came to help again. Today was mostly rafters, I cut, he placed. There was some clean-up of the north east gable wall so all the look-outs would be perfectly placed over the dropped gable end. I still need to cut all the blocking for the gable ends...
I also added a couple of extra studs under the end beam of the loft floor at the walls for extra support, removing a small shear moment in the top plates and returning the gravity load of the beam directly into the middle piers.
The cathedral part of the roof is now basically complete. I cut the flying/barge rafters for both ends and moved all the 2x8 subfacia boards to a staging area. I also had to move a great number of 2x12s and other boards to get access to the rest of the rafter 2x6s. Some extra 2x6 are arriving in a few days for the final dormer framing (and they need a landing spot out in the driveway!). The dormer loft design change requires some extra 8-foot for the dormer gable walls, rafters and cripple studs for the cheek walls. The ridges will be 2x10s which I already have.
Really nice weather which helped get a lot done. First order of the day was to place the other half of the ridge beam, at long last the ridge is fully spanned structurally! To do this we constructed the temporary build platform as planned, it did not need the central post I had assumed it would, but Richard weighs about half what I do! Two doubled 2x6x16s and some OSB was sufficient - I had planned something far more over-built.
Things did not go particularly smoothly afterwards however, small geometrical errors accumulated causing a fair bit of rework to the gable frames for the east wall which ate up a lot of time. They should have been identical to each other and to the west wall, but no amount of level and square checking, measuring and active alignment would make them correct enough to level up the look-outs without some trimming.
Completed the framing for the west gable wall itself. Squared and plumbed up everything and secured the ridge beam at that end. On the north half I added the 1st common rafter and look-outs crossing the dropped gable top chord for later attachment of the barge rafter supporting the gable overhang.
Did some design work and measuring for the dormers. I think I will make the ridges match up to the main ridge directly and use a shingle-compatible minimal slope like 3/12 or 4/12 for the fairly short dormer rafter spans to maximise the headroom. I just can't bring myself to make a shed dormer, but am willing to have a different pitch for the dormers than the main roof.
Finally stopped procrastinating the gable framing! I marked up the last common rafter with the width of a 2x4 (i.e the lookouts) so I could simply see when that line intersected with the ridge beam and measure from the bottom plate of the gable wall up to that point. Of course it exactly matched what I had computed geometrically so I should have just trusted the model...
Not a very exciting video, had a brutal headache which made things pretty slow going. There was a lot of placement checking and measuring and the frame assembly isn't visible, sorry I'll get a better camera placement next time. Only managed to make one half of the wall and get it placed before the light faded and the rain started really coming down. I kept the top chord open at the longest stud until the wall was placed so the ridge beam post could be perfectly plumbed against it. Naturally enough I marked the bottom plate for the south part of the west gable wall at the same time as north one. Because of symmetry all the gable wall halves will be identical (I confirmed this for the west wall at least) so I can just measure and cut sets of three more boards and fab them with fair confidence they will fit. The two small windows are narrower than the stud spacing so I will place their sills before I sheath the wall. This wall isn't structurally loaded much because of the ridge beam; almost all the load except for the barge/flying rafter and part of the gable overhang goes onto the beam and north/south walls. So the tiny window headers can be trivial. The gable really needs to be tensile capable not just gravity resisting to prevent the roof tearing off in high winds, there will be lots of ties to anchor the roof at the edges, and naturally all the way along at both ends of every rafter.
The more I work up the loft the more I want to make more room up in there. I kinda want to add dormers even though it means some careful framing and flashing to make it robust and leak proof. A shed dormer would give the largest volume and standing room but is kinda ugly. Paired dormers pointing north and south would make the loft floor space cruciform which is a little weird, it already is kinda church-like with the huge cathedral... However a pair of wall-integrated dormers of either roof style would maximise the useful floor area. One thing I could do is a small balcony to the north where the view is, but that seems likely to leak without heroic flashing as the current subfloor is very level and was never designed to be used with an external finish... If I don't investigate dormers I may regret it - I can obviously add them later, but it would be a lot more work than doing it now.
Still no gable framing, but some fine tuning of the rafter bird's mouth cuts and templates are now complete for all the common rafters. The barge/flying rafter won't have the bird's mouth, just the notch for the ridge beam.
Did a bit of earth moving at the north side to flatten the ground there and make it safer to use the ladder. Also did a general clean-up of all the small scrap, etc to remove trip hazards in that area also.
Gonna have to make some scaffolding for the cathedral end work.
Today was mostly moving lots of lumber around. As usual the boards I needed were on the bottom of the pile, so at least a thousand kg of wood had to be moved before I could carry the loft beam plys to the site.
Installed the center post for the ridge beam. Not cut to length yet, will do that in place later.
The structure was a bit wobbly moving around on the loft deck so I installed one sheet of outer wall sheathing to the west wall which stiffened it quite a lot.
Spent a bit of time thinking about and roughly placing the stair railing and loft balcony pony wall.
Built the south pony wall for the loft to brace the central post for the ridge beam. I will move the stairs a little south I think so the south side hand railing connects straight to the central post, this will also improve the headroom a little bit at the top of the stairs. The north pony wall can then be placed to accept the north railing. The pony walls outer ends meet up with a rafter so the north one in particular can have some lateral bracing. If I add knee walls to the loft space that can brace the pony walls too, but that isn't structurally required for this roof and would enclose the space a bit that otherwise is useful storage.
Erected the ridge beam post in the west gable wall and braced it temporarily until the dropped gable frame goes in. Trimmed both posts to length and installed the wood connector plates at the central post where the ridge beam splice will be supported directly over the post. The beam plys were then cut and installed and the plywood cores added and everything laminated together.
I need to stop procrastinating the gable framing. I'll touch up the template rafter then cut enough rafters to make the field measurement and placement of the lookouts easy. The gable frame looks fine in CAD, I just need to actually cut and place it. I need to add at least once piece of sheathing on the north and south walls before I can place the 1st common rafter to butt the lookouts up to and hang the fly rafters on the gable overhang.
Cut down a dead tree and made some rough ship ladder stairs for the loft.
Definitely needs handrails to be safe and usable. The top stair tread is larger than the rest (wider and deeper), for now I used the same 2x8 as for all the other treads, I'll replace it with one cut to the exact size once the handrail is attached. I think I am just going to use 2x4s for the handrail for now. These are not nice final stairs, just something to make things easier during the build.
The double stringers are pretty heavy, each is two hemlock 2x12s almost 3 metres long. I had planned to use Douglas fir but all the 2x12 doug firs I had available are splitting or generally crappy being plain sawn, cuped, checked, shaked, having gum veins, etc. I guess I could have just made cleats instead of laminating a full and notched stringer on each side. I wanted them strong though, so I didn't want to do a routed stringer and the laminated notched and full stringer is a bit of a compromise between both with extra strength.
The subfloor for the loft slightly overlaps the top plate so the rafters for the roof over the loft will have double bird's mouth cuts. This actually gives them better seating than they would have had otherwise because the pitch is 45 degrees and the seat is pretty short to avoid notching too much of the rafter. Of course actually having both seats touch together requires some precision in the rafter cutting... time will tell how well that works out.
The 2x12s I have for the ridge beam are a little short to meet properly over the central post, so I have to wait for 16 footers before I can make the ridge beam. This also lets me bring the ridge out for the gable overhang and not have to fully ladder frame the ends. I ordered the shear sheathing and building wrap and some additional 2x6x16s for the west-end work platform. Tomorrow I will probably get the posts placed, maybe build a ladder/steep stairs for the loft. Can't really finish the gable frame until I know the exact depth of the ridge beam.
Made a jig on a scrap PT 2x12 for cutting the joists to length. I wish I had more of the 2x6x16s left that I made the double full-span joist with, that would have been much easier than the central header. Although those last two 2x6x16s were a bit warped and not completely clear. The 2x6x8s are generally easier to get find nice clear ones. There is plenty of support and I will add some connectors at the beam when I secure the joists to the plates.
I think I'll revisit how I placed the first joist and central header at the gable wall. It is eating up some of the ridge beam post bearing area. I could totally block this up and plane it flat, but yeah, I can just move that joist slightly and have a much easier time with the gable framing and have the post directly bear on the plates and loft floor beam.
So clean-up the gable end, and toenail tack the plate ends of the joists and we can do the subfloor. The joists will be thru-nailed to the rafters once they are placed, the rafters sit right alongside the joists directly over studs. This does mean there is a shear moment from the loft joists in the top plates, but the loft loading is smaller than the roof loading (which will be simply supported by the studs) and the doubled plates are extremely strong, the area in shear is 3x5.5 while the joist's own shear area from its support over the plates is half that. If I was really worried I'd double the studs, but it is not necessary.
Marked north and south top plates for rafters and loft joists.
The loft floor beam wasn't very flat and the bearing for the mid-span joist header was kinda terrible, so I cleaned that up with the circular saw and power planer. I love the planer, don't know how I lived without one before. In general, all the cordless power tools have been wonderful. I've standardised on DeWalt so I can share batteries, with the exception of the Ryobi post hole digger and Senco screw gun for which DeWalt doesn't really have an equivalent. Doing this without power tools would have been very tedious. Sure the nailers are flywheel-based and a bit heavier, slower and less powerful than pneumatic units, but there is no damn hose to deal with and we are nailing Douglas-fir here, not iron wood!
That said, in the process of roughing down the beam with the circular saw I managed to cook both of my 10 amp-hr DeWalt batteries: The internal wiring got so hot in one it melted the casing at each end of the pack string. The other just stopped working; the gauge no longer shows anything and it refuses to charge. I assume I just opened an internal fuse on that one? The other appears to be mostly cosmetically damaged but otherwise is still functional. My guess is the lower internal impedance of these large batteries (more cells in parallel?) means they can deliver enough current to be self-destructive where the smaller, say 6 A.hr batteries will under voltage cut-out before they melt themselves. I wasn't really bogging the saw down either, it was rubbing a bit - kinda unavoidable in this particular awkward sideways 8-ft up on a ladder cut - only enough to burn a spot or two on the wood slightly, but not trigger the saw's protection hardware. I think I'll contact their support about a replacement for the totally dead battery - and maybe the melted one too. If they won't honor it I'll just repair them myself. I think the 6 A.hr batteries are a better overall price/performance option, but I do love being able to cut framing timbers pretty much all day on a single charge with the 10 A.hr ones.
Next step is to install the loft floor joists, then the subfloor, and on to the gable framing, ridge beam posts, the ridge beam and then the rafters and gable overhang ladders. I will place a temporary work platform for the east gable framing and ridge beam install.
Very basic rough stairs; open risers, no handrails, newels or balusters, 5 steps, pressure treated 2x boards. Three 2x12 stringers, two 2x6 per step for the treads spaced slightly for drainage with a small nosing, 7/11 rise and run, 4 foot wide. I treated all the cut surfaces of the treated lumber with copper naphthenate wood preservative but I didn't put butyl tape on the tops of the stringers... regardless they should last a fair while, plenty long enough to complete the build. I'll make nicer stairs and attach them with proper ledger flashing once I do the siding. For now these just make it much safer and easier to get in and out of the building!
Built the full-height ridge beam post into the east wall, but otherwise pretty much the same as the west one with the exception of the two fairly large windows. The north wall has a large window placed as in the south wall, and a one smaller 2x3 window.
Probably frame and subfloor the loft next so as to give a nice work platform for framing the west gable which has two small windows, one each side of the ridge beam post. I'll probably build a temporary platform over the cathedral end too for framing the east gable. Then shear sheathing for the walls, ridge beam central post and the big beam itself, and finally rafters and subfacia to pretty much complete the framing... Then of course roofing, siding, trimming, build some stairs, electrical, plumbing, drywall, flooring etc.
The rest of the day involved layout for the east wall and making the headers for its windows, cutting all the studs, etc. Tomorrow should see it built and stood up along with full-height post for the ridge beam. Hopefully also the north wall, but there is a little debate about the position of the medium sized window in that wall and its relationship to a partition wall for the wet area. I haven't completed the CAD to my satisfaction yet, especially fully thinking out the services routing in that wall. There has been a bit of scope creep to plumbing which wasn't originally planned.
Laid out the sole and top plates for the south wall, cut the sills and assembled one of the insulated headers for the larger window in this wall.
Didn't bother to bring the mitre saw out for the studs, just nailed a jig straight to the corner of the building and used it to cut the studs to length with the cordless circular saw.
The west wall has no windows below the gable so it is a trivial framing job and a good warm-up for the rest of the building. The only slight complication is the post for the loft floor beam (and also the ridge beam eventually). I wanted this simply supported like most of the rest of the structural work, so I framed the west wall in two halves that just nail straight to the post and the beam sits on top flush with the top plates. There will be bracing for the ridge beam post in the gable framing later, the ridge beam will have a short cantilever extension for the gable overhang ladder framing.
The time lapse camera battery died just before the clean-up, but basically caught all the action. Christian (the guy who's studio this will be) is quite tall which was helpful during the beam ply placement and lamination. I put the 2nd top plate on after the wall was in place, normally I'd put it on before raising the wall, but I wanted to give more room for the beam placement - in hindsight this was unnecessary and mostly just annoying to place later.
Laid the posts roughly where they will go and the west wall sole plates. That's all folks, got windy and rainy so called it a day early instead of framing that west wall which was the original plan.
The neighbors Frank, Jeff and Kim were awesome again and helped out with the subfloor sheeting. Even Terry and the dogs helped a bit today. Got it done very quickly.
Glued and screwed the plywood down after carefully foam sealing any gaps between the insulation and the floor frame boards. The floor screw gun was OK, but jammed or misfeed a lot. I had a fair number of shiners and missed screws to carefully fix afterwards.
Next is wall framing.
Only managed to finish up the last of the floor insulation. Blowing off the water wasn't helping much as it just kept starting to rain again. Will wait for a better day to do the subfloor sheeting.
Rain and hail slowed proceedings, got about 2/3rds of the floor insulated now. Had to give up for the evening when the hot knife was getting so wet I was worried it would give me a strong electric shock (water had already confused its cooling fan temperature sensor, figured my cardiovascular system might be next).
The shorter element/blade in the knife does heat up quicker, but it doesn't really cut much faster, ultimately it seems to be power limited: The cutter is specified as 200 watts, the heat capacity of polystyrene is about 1 kJ/kg/K, the styrofoam sheet is about 2.5 kg for its 149 litre volume so its density is about 0.016 g/cc. The energy involved in the phase change to liquid and gas as it cuts isn't well specified, but the knife contact area is about 100 mm^2 (a bit less than 2 mm kerf, 50 mm thick sheet, angled blade, complicated transition region of melting/decomposition, but a 2.5 meter long slice or about 250 ml - a cup - of foam needs to be heated. That's only 4 grams of polystyrene or about 4 joules per kelvin and we need to heat it at least 250 kelvin probably quite a bit more, so say about 1 kJ. The cutter (if it was 100% efficient and it isn't) could deliver that in 5 seconds... Realistically it is taking about 30 seconds to make that cut. I didn't include a lot of the latent heats and the general complexity of what it actually happening at the cut point... So I think it is still fairly reasonable to assume the cut is largely thermal power limited. More power would be desirable, but 250 watts is the most powerful available at a reasonable price and I am almost finished, so no big deal.
Light day of work today, started late after taking care of other chores. Ran out of light a bit short of half way insulating the floor deck. Probably another half-day to finish it up including expanding foam in any poorly sealing spots. Then comes probably the most annoying part of the entire build - placing and screwing down the subfloor plywood. Will definitely need some help with that, subfloor sheets are too heavy and awkward to easily place solo.
The hot-knife makes much less mess than the circular saw, but it is significantly slower. I'll try the shorter blade tomorrow, I don't need the 100 mm one. The shorter one should be a lower impedance and heat up quicker and cut faster - hopefully - a good bit of time is waiting for the knife to get up to temperature and the cut-rate is limited by the thermal load of the material as it cuts, so a better match between heated element and material is likely to improve cutting performance.
Started by cleaning up around the site, the collection of junk and rocks had created a trip hazard, it is a rough and sloping site which is less than ideal in the best of cases, but with my freshly healing broken ankle I can't afford to re-injure it. Moved all the concrete form work timber and also removed the batter boards which are now mostly just getting in the way. This was a lot easier than I expected, the star post puller made short work of extracting the driven 2x4 posts.
I finished up the panel edge blocking and carefully measured things ready for subfloor, added some redundant blocking where things were a bit close and there was a chance of missing the joist or blocking if I wasn't careful. Checked for any shiners and missed nails on every timber.
Once the light faded I practiced with the hot-knife slicing up a sheet of insulation foam. Tomorrow I'll take the saw horses outside with an extension cord and cut the insulation close to its install location. This should make it easier to mark and field-fit the odd pieces. I have spray foam to seal the edges of any medium sized misfitting. The foam has a vapour barrier as part of its radiant layer and is closed-cell anyway so I shouldn't need an additional vapour barrier and any large spills being able to drain out from below the subfloor is probably a good thing. 90% of building is moisture management.
Finished up the last few joists, closed the rim joist, added corner brackets and tied the floor frame to the girders. Then the blocking for the ridge beam post locations and the subfloor sheet edges.
Ran out of light before I completely finished the northern half of the blocking. The frame is at an annoying height almost everywhere but especially so in the north west corner; tall enough to be hard to step through and not tall enough to duck under, the batons for the insulation breaking up the clear space in the bays is annoying too.
Tomorrow is insulation day, lots of cutting 14.5" slices to drop into the bays.
Crappy weather, very cold and raining. Not much achieved today at all.
In better news the nailgun is finally cooperating! Finished middle girder lamination in-place (not filmed). Aligned and bolted the north and south girders to the pier brackets. Checked middle girder level, unacceptably terrible! Center pier is high enough that the girder can rock about 2 inches high at one end. All the other piers are fine. Not a situation that can be shimmed out. Will have to chip out concrete from the pier and trim j-bolt slightly to align and level properly.
Spent a bit of time after power pole distraction cutting up and dragging downed trees to the waste pile. This will give me a better location for the camera as we progress to non-foundation work on the studio, and in general clean the yard up a bit - still a giant mess though.
Universal rule of construction; start digging a foundation and it will rain. Also, your site will be on a field full of potato to head-sized rocks and you will hit a mysterious buried object that is impenetrable and seemingly edgeless!
Hard going; started with Violet having destroyed the string lines in the early morning. I had marked the batter boards so this was relatively easy to fix. Layout and marking of the 1st 10 of the 15 pier locations went easily once I untangled the lines and rolled them up out the way for future form work and J-bolt alignment.
Digging the pier holes however was a bit of a disaster. The site is absolutely jam packed full of medium sized river stones, from potato sized to much larger. This is extremely annoying to bore into with the auger, it makes it kick hard when you hit one and I am still sore from levering and lifting them out of the holes with a digging bar and post manual hole digger. About 1 meter down below grade I hit something hard, basically impenetrable and apparently large enough that all the holes I dug hit it. I have to work out what it is before I can continue, it is not on any maps of the site I consulted before starting the project. It shouldn't be bedrock here, it isn't a pipe or drain-field, and it doesn't look like concrete. I am at a bit of a loss as to what it actually is?
Started laminating the middle girder in place which may have been a mistake to do before fixing the piers properly. The nails got wet which caused the gun to jam many times, frustrating progress. Plenty of "help" from Violet the puppy today. She's adorable but tries to kill herself with power tools or heavy objects on a regular basis. Much less scary work today, so she had more time out and about.
I did manage to repair the cart that was damaged hauling concrete and move all the 2x12 pressure treated lumber off the pallet in the drive way to exposed to 2x8s underneath. Unfortunately the pressure treated 1/2" ply was stacked on the bottom of the same pallet as the timbers for the girders and rim joists.
Level and alignment looks good, definitely worth all the careful layout and pier placement. Next step is to bolt down the girder attachments, get that 1/2" ply out and cut up the cores, insert them and laminate the girder in-place.
Today was busy in general, you can see the roofers at work on my shop roof at the same time. It has been leaking for ages, they stripped, repaired a rotted purlin and sheeted it. Tomorrow they shingle.
While the concrete cured I cleaned up a bit as the GPR survey of the septic drain field is tomorrow. Tried to cut up and move most of the larger of the two trees that were felled by the shop roofing team. I'll have to chainsaw up the main trunk tomorrow.
Weather was light rain all day with occasional heavier bursts. Next few days look worse. Pretty typical for the Pacific North West this time of year, and of course any time you start a foundation!
Violet the puppy ran through and broke the string lines multiple times. Squaring is hard by yourself, my lovely neighbors came over to distract Violet and help measure the diagonals. I was only 12 mm out of square, which is actually spectacular over a foundation this size for just using a mixture of Pythagoras, an auto level and 3-plane laser level projector.
Moved a bit of lumber for the other shed building too, its treated 2x8 beam plys and rim joists are now in the general location they should be. Driveway is still full of longer lumber for the studio floor that will be consumed in the next few days and we will finally be up and out of the ground and into wall framing.
In the morning I completed laminating and aligning the north girder.
Richard came over and helped me for the rest of the day which was immensely helpful. Together we completed the middle piers; layout, digging, form work, footings, rebar, concrete and j-bolts.
Next I will strip the form work, then add the brackets to the j-bolts and place and laminate the middle girder. Once everything is in place and shimmed/aligned I will bolt the girders down to the piers and it will be time to frame the floor deck. Nice to finally be "done" with the foundations!
Violet the puppy stole one of the attachment plate caps, I searched briefly for it, but had to use a spare for now. I am sure it is somewhere in the yard, or maybe under the deck!
My neighbors Jeff and Frank offered to help so they loaded up some 2x6x8 lumber into the cart and dragged it over to the building. In the meantime I finished fixing the middle girder.
Got out the hydraulic jack and jacked up the middle girder to release it from the center pier. Chipped bracket mount point down into the pier a bit and after a few tests did the same to one other pier to get it perfect. Trimmed the j-bolts and remounted the brackets, leveled and plumbed the girder then bolted it in place.
Placed, joined and cut the treated rim joists. Same with the central header joist. Started cutting and dry fitting the floor joists. Tomorrow I rake the under-building area clean and as flat as possible then finish the floor framing ready for insulation and subfloor sheeting.
Tried to rake the area under the building clean, moved the big lumps of concrete and rocks, but the ground was frozen enough to make that a challenge. Beat up big stuff with the digging bar but eventually gave up in favour of getting going on framing.
Installing the insulation retainer batons on the underside of the joists was particularly annoying and consumed much time and profanity. It was easier to do as you went with the joists which was only possible on the southern span as the northern one was already completed when I went to fetch the furring strips.
Finally moved the concrete mixer, hopefully we won't need that for a while.
Ran out of light with only 4 joists to go which was disappointing. Tomorrow I finish the last four joists, close up the east the rim joist and add corner brackets to stiffen the frame a little bit (it is already quite firm), then add the blocking for the ridge beam post landing spots onto the middle girder plus the edges of the floor decking. Then there is a lot of joist to girder ties after square checking followed by insulation cutting and placement before decking can happen.
Errata: Whoops! There is a mistake in the neon bistable circuit diagram, the second capacitor drawn going below the two cathode resistors goes to the wrong nodes, it should go to the other diode/neon and diode/resistor nodes in the typical "cross" form bistable feedback topology.
Flashing Light Prize 2018: flashinglightprize.com
Flasher itself is a discrete 130 kHz EM event detector. I've used similar circuits before as lightning detectors, but this one was built from whatever value parts I could find on my bench. It is not optimal and pulls about 14 mA quiescent current, you could do much better by optimising the components values. I figured I had a few more hours until entries closed, so I just had to hack something else up before I went home tonight. :)
The flash timing is implemented using a water dripping system. Each drop of water carries a small amount of charge from a Leyden jar polarising storage capacitor. The pulse of charge rings the tank circuit in the front end of the LW pulse detector and flashes the light. A Hoffman clamp regulates the drop rate, which is somewhat dependent upon the leyden jar voltage. Too much voltage will cause electrospraying, too little and it won't trigger the event detector.
I charged the Leyden jar using a Zerostat gun (which is basically a dust removal tool for LP records - it uses an piezo generator to spray charge from a sharp needle, the polarity alternates when you squeeze and release the trigger). Yes, there is enough water and charge to flash for more than 5 minutes!
The contest is probably more about interesting and exotic ways to blink a bulb, but I've been doing glass work lately and decided it would be a great time to try and make my own light bulbs. I had a more nutty oscillator in mind, but unfortunately it failed a few days after construction, so I ended up using this fairly straight forward relay-based relaxation oscillator.
The bulb is soda-lime glass. The feed-through seals are borated dumet wire. The internal frame is pure nickel, spot welded to the dumet. The filament is molybdenum and is spot welded to the flattened ends of the nickel. Once completed the bulb was annealed for several hours to remove residual stresses in the glass, then pumped down and baked out using its own filament to heat it.
A pair of similar bulbs were constructed, they look quite different, especially the feed-through seal region and bulb, but both operate similarly. The voltages are different because they have different length filaments. I measured the filaments V/I characteristics which ended up pretty typical for incandescent light bulbs.
The bulbs slowly blackened during the bake-out. It isn't completely clear if they are continuing to darken, or if this was just associated with the initial filament flashing. They are fairly low pressure, so evaporation of the filament is to be expected. The residual pressure seems stable, but is high enough to cause bluish gas discharge with a neon tester coil brought near the bulb.
The oscillator assembly is laser-cut PMMA. The relay is some random open-frame relay from the junkbox. The rheostat is 10 ohms worth of kanthal wire. Some assorted M3 hardware, coils of hook-up wire and some knurled nuts complete the unit.
It operates from about 8 volts and pulls an ampere or so, depending on the light bulb used.
Note the IR LED sync pulses emitted by the sync blinker globally into the tracking volume. The sync pulses tell the receiver when the rotors are pointing in a known direction. The time between these sync pulses and the flash from a rotor beam sweeping past sensors on a tracked object are used to compute the angle of each sensor with respect to the axis of the rotor. From these bearing angles (azimuth and elevation of the sensor seen at the base station) and knowing the configuration of sensors on the tracked object the pose of the object (its 6-DOF position and orientation) can be determined with high resolution.
The sync pulses are also modulated to communicate base station identification and calibration to receivers in the tracking volume. The calibration information includes the measured nonidealities of the base station optical emissions and improves the global accuracy of the tracking by allowing the pose fitter to compensate for these nonidealities.
The video was made by slightly aliasing the camera frame rate against the spin rate of the rotors. There are some artifacts in the image caused by the brightness of the rotor beams interacting with the camera image sensor before read-out.
Or you could just carry around a 1 Meg, 2+ Watt (or otherwise HV-rated) resistor.