Even more track lighting installed in the UDoIt workshop @UDoIt2
Even more track lighting installed in the UDoIt workshop  @UDoIt2
Uploaded April 2025 | Updated September 2026, 3 weeks ago
I'm able to hang track lighting track in about 15 minutes with the VEVOR drywall lift. I place the track (open side down) on top of the lift and crank it up until the top of the track is just barely touching the ceiling. Once I determine the position I install an anchor and secure the track to one point. Then I position the track in alignment with the wall and use a pencil to mark the holes. It's easy to push the track out of the way, install anchors, put the track back and secure the track into the anchors with screws.

I'm using two different methods of powering the track. One is an outlet and another is the track plug in dongle.

Video Credits:
Video Production: U Do It™️ Studios a Division of No Cheese Records LLC All Rights Reserved. No Cheese Records® is a Registered Trademark of No Cheese Records LLC All Rights Reserved.
Even more track lighting installed in the UDoIt workshopReplacing Dodge Ram FRAM Extra Guard Engine Air Filter part number CA11034Trying the RZ Mask while cutting half lap jointsHow do you anchor a shed? With American Earth Anchors of CourseHow to grow your Instagram to 10k followers organically for the swipe up feature on InstagramCut 8mm rod for Gantry Bearing Blocks to hold 608 Bearings #PlasmaCNCHow to Install a Door LeverUDoIt Reviews Holmes Air Purifier and EGR AER1 FiltersUsing Rustoleum Copper Coat to Extend the life of Pressure Treated WoodRestore your concrete with this pressure washer surface cleanerHow to Fill Windshield Washer Fluid in 2022 Dodge Ram 1500Designing an Address Cutout for Mailbox Post
U Do It |

Even more track lighting installed in the UDoIt workshop

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER