Uploaded July 2018 | Updated September 2026, 2 weeks ago
The Nandi Infrastructure Corridor Enterprises Road, officially called Bengaluru–Mysuru Infrastructure Corridor (BMIC), is a private tolled expressway that completes a half-circle around the periphery of the city of Bangalore (Bengaluru).
As of May 2017, around 800,000 vehicles use the road daily to travel around the city of Bengaluru, bypassing many traffic clogged city junctions.
It is under-construction 4-lane expressway which is planned to connect Mysore and Bangalore.
First part of the project has been completed, which is a 9 km long stretch connecting NICE Ring Road in Varahasandra to Outer Ring Road in Nayanda Halli.
It is planned to go through Mysuru, Pandavapura, Mandya, Channapattana and Bengaluru.
(From Wikipedia)
Rec on: 23 Jun 2018
Route Map: goo.gl/maps/go7VVL4z7jK2
You can also find us on
Instagram: instagram.com/keepondrivingg
Twitter: twitter.com/keepondrivingg
The Nandi Infrastructure Corridor Enterprises Road, officially called Bengaluru–Mysuru Infrastructure Corridor (BMIC), is a private tolled expressway that completes a half-circle around the periphery of the city of Bangalore (Bengaluru).
As of May 2017, around 800,000 vehicles use the road daily to travel around the city of Bengaluru, bypassing many traffic clogged city junctions.
It is under-construction 4-lane expressway which is planned to connect Mysore and Bangalore.
First part of the project has been completed, which is a 9 km long stretch connecting NICE Ring Road in Varahasandra to Outer Ring Road in Nayanda Halli.
It is planned to go through Mysuru, Pandavapura, Mandya, Channapattana and Bengaluru.
(From Wikipedia)
Rec on: 23 Jun 2018
Route Map: goo.gl/maps/go7VVL4z7jK2
You can also find us on
Instagram: instagram.com/keepondrivingg
Twitter: twitter.com/keepondrivingg










