Crossrail Railway Systems: Track installation between Royal Oak Portal and Bond Street @CrossrailLtd
Crossrail Railway Systems: Track installation between Royal Oak Portal and Bond Street  @CrossrailLtd
Uploaded July 2016 | Updated September 2026, 3 weeks ago
This video highlights the latest fit-out activity underway in the tunnels between Royal Oak Portal and Bond Street.

To support permanent track installation in the west, a concrete shuttle is used to transport concrete from a temporary railhead at Westbourne Park. Pre-mixed fibre reinforced concrete from the batching plant is loaded onto the shuttle, delivered into the tunnels and pumped into place.

A fleet of customised machinery is supporting the fit-out of the tunnels. These works are part of Crossrail’s railway systems activity to fit-out the tunnels, stations, shafts and portals with the vital infrastructure ahead of TfL-run Elizabeth line services operating through central London from 2018.

For more information visit:
crossrail.co.uk

Video released in 2016
Crossrail Railway Systems: Track installation between Royal Oak Portal and Bond StreetCrossrail milestone: Mayor makes first station to station journey as project reaches 75% completeDesign & Architecture: Liverpool Street Elizabeth line stationDesign & Architecture: Canary Wharf Elizabeth line stationCrossrail Surface: Acton dive-under structurally completeDesign & Architecture: Whitechapel Elizabeth line stationRailway Progress: Paddington Elizabeth line station (August 2021)Moving Ahead, May 2017: Crossrails quarterly update
Crossrail Project |

Crossrail Railway Systems: Track installation between Royal Oak Portal and Bond Street

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER