CBA/ABANA Level III Grille: The Final assembly @MarkAspery
CBA/ABANA Level III Grille: The Final assembly  @MarkAspery
Uploaded March 2021 | Updated September 2026, 2 weeks ago
Final assembly of the blown-over beveled leaf scrolls, and the beveled C-scrolls. Video finishes with the hot-fitting of the forged central collar.
This video, while stand alone, is designed to support a course of instruction such as the California Blacksmith Association's Zoom Tutorials or a CBA/ABANA hands-on instructional class.
CBA/ABANA Level III Grille: The Final assemblyCBA/ABANA Level III Grille Coaching sessions: Basic tooling not covered in future coaching sessionsDarryl Nelsons Two-dimensional Bears HeadCBA/ABANA National Curriculum Level III - Coaching Sessions: The Blown Over Beveled leaf scrollCBA/ABANA Level III Grille: Making the Grille Frame & Frame assembly - Edited videoCollars: The CBA Level 3 center collar. The pinned or tenoned collar and its applications.Blacksmithing - Old School Project: The Filing Vise - Part 2Blacksmithing - Ring Project #3 punching & drifting the square barBlacksmithing - Getting Started: The Threaded Tenon. CBA Level I.CBA Instructor Training - Vista.CBA Power Hammer Clinic with TobyForge - Welding: scarf-theory. CBA Level I. CBA Level II.
Mark Aspery |

CBA/ABANA Level III Grille: The Final assembly

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER