HS2 Ltd
HS2 begins assembling Turweston green bridge deck
updated
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #timelapse #motorway #bridge
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
It marks the next step on the programme to build a series of viaducts to carry the railway through Birmingham’s industrial heartland and into the city centre.
The completed six metre-high section of viaducts is where the structure widen from a single deck to four separate decks, spanning 65 metres at the widest point, to carry the tracks to the Curzon Street Station platforms.
Listen to Stefan as he explains how these structures were built.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:11 What is the purpose of the viaduct?
0:29 Our last update
0:40 Ramping up construction on site
1:03 Designing the viaduct
1:47 Preparing the site
2:53 Working with Mace Dragados
3:18 How much concrete has been poured?
3:35 Adding the parapets
3:56 Moving to the top of the deck
4:10 Constructing the deck section
5:31 What happens next?
6:05 Closing comments
6:21 Let us know your thoughts!
6:28 Outro
#HS2 #Construction #birmingham #update
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The 853m long tunnel will eventually allow materials required for the Euston Tunnel to be transported to the site without clogging up local roads.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #timelapse
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The A43 – which links Oxford, Brackley and Northampton – is a vital route, providing access to Silverstone and connections between the M40 and M1.
To keep traffic flowing throughout the complex build, HS2’s engineers worked closely with National Highways to realign the two carriageways to create space for the construction of the bridge deck, which will be assembled at ground level.
They have now begun work on the deep piled foundation that will support the weight of the bridge. These will be topped with concrete pile caps and piers supporting the bridge deck that will carry the road.
Once the deck has been completed, the road will be moved back over the new bridge and excavation can begin to create space for the railway to pass underneath. This four stage approach was designed to keep traffic flowing and disruption to a minimum.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:08 What is the A43 bridge?
0:26 What are we celebrating?
0:38 Previous works
0:59 Constructing the bridge
1:22 Working with National Highways
1:43 Works after the foundations
2:09 Minimising the disruption
2:39 Final thoughts
3:00 Outro
#HS2 #Construction #NationalHighways
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Hear from Stoford, the developer leading the creation of the Tea Factory, a new home for the BBC in Digbeth, close to HS2.
New research shows that the future arrival of HS2 in the West Midlands is already driving huge investor confidence in the region, with data pointing to an economic uplift of £10billion over the next 10 years.
Economic analysis of the areas close to HS2’s three hubs in the West Midlands - Curzon Street Station in central Birmingham, Interchange Station in Solihull, and the Washwood Heath Depot and Network Integrated Control Centre - shows dramatic increases in regeneration and investment in the last six years.
Find out more at: hs2.org.uk/hs2itwm
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #hs2itwm #regeneration #investment #westmidlands #birmingham
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #news #drone #viaduct #lakes
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
After only two weeks of free training, she gained an industry-recognised license to drive articulated dumper trucks and later became the first woman in the UK to be qualified to drive a 'grader' - a 25-tonne machine with a long blade underneath used to create a level surface.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #training #womeninconstruction
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The Copthall Tunnel is one of five green tunnels on the HS2 route, which are shallower tunnels which will be finished with trees, plants and shrubs on top – helping them blend into the natural landscape. Materials from the excavation are kept on site and then reused on the tunnel surroundings, reducing movement of spoil.
In this latest update, we focus on the progress made on the tunnel such as the completion of the cut, the reopening of the new realigned Harvil Road, the works made on the central section, including the construction of the first vent stack and the work on the soil placement areas (SPAs).
In the Northern SPA, the planting of the first 1,300 plants has began. This is part of 70,000 individual trees, shrubs and bushes that will transform the area into a haven of biodiversity once the landscaping is complete.
The tunnelling team have excavated approximately 500,000m3 of TBM material which is being used to form three mounds within the Southern SPA, keeping the material within site boundaries at Copthall.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:06 Latest works on the tunnel
0:43 What is the Copthall Tunnel?
0:59 The first vent stack
1:23 Rebar facility update
1:39 No lost time incidents
2:01 Backfilling over the tunnel
2:37 Latest environmental works
2:43 What is the NSPA?
3:10 What is the SSPA?
4:01 Update on the SSPA
4:23 Planting the first trees at the NSPA
5:10 Upcoming works on the tunnel
5:44 Outro
#HS2 #Construction #update #tunnel
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #wembley #london #construction #drone #tunnel #dronefootage
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The purpose-built Operator Skills Hubs are designed to upskill local people for free, preparing them for jobs on HS2 and other Flannery projects in as little as two weeks. Once learners pass the course, they are guaranteed an interview with one of the employers of the Flannery-affiliated projects.
To apply for training opportunities with our training partner Flannery Plant Hire, visit: flanneryplanthire.com/plant-operator-training
To see all the current available opportunities with HS2 and to apply, visit: hs2.org.uk/jobs-and-skills/careers-with-hs2-ltd
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 What is the skills hub?
0:13 Introducing the boot camp
0:35 What's the boot camp like?
1:11 Support and training
1:30 What will they achieve?
1:47 Inclusive training
1:58 More opportunities available
2:15 Final thoughts
2:44 Outro
#HS2 #Construction #Jobs
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Birmingham Curzon Street Station, which will be net zero carbon in operation, will be the first brand new intercity terminus station built in Britain since the 19th Century.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #dronefootage
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
This update will show how the team of around 450 people worked together to begin the construction of the Bromford Tunnel.
The first TBM launched, in August 2023, is called 'Mary Ann' after Mary Ann Evans, better known by her pen name George Eliot, who was an English novelist. The name was suggested by the Warwickshire community.
The second bore began in March 2024 and will be dug by TBM 'Elizabeth' after Dame Elizabeth Cadbury, who spent her life campaigning for the education and welfare of women in Birmingham. Pupils from Paget Primary School in Birmingham chose the name.
The expert tunnelling team will operate the TBM 24/7, with each bore taking around 16 months. 1.87 million tonnes of material will be excavated and sifted at the on-site slurry treatment plant to be reused on nearby sites at the Delta Junction viaduct.
Find out more at: hs2.org.uk/bromford-tunnel
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:11 What is the Bromford Tunnel?
0:29 Extending the tunnel
0:49 TBM Mary Ann progress update
1:23 How is the tunnel being built?
2:01 A collaborative effort
2:18 Constructing the porous portal
2:45 TBM Elizabeth progress update
3:26 Naming the second TBM
4:15 Working on the project
4:57 Tunnel segment factory
5:16 Reusing excavated material
5:55 Final thoughts
6:32 Outro
#HS2 #Construction #update #birmingham #tunnel #tunnelling #highspeed #train
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
After only two weeks of free training, she gained an industry-recognised license to drive articulated dumper trucks and later became the first woman in the UK to be qualified to drive a 'grader' - a 25-tonne machine with a long blade underneath used to create a level surface.
To apply for training opportunities with our training partner Flannery Plant Hire, visit: flanneryplanthire.com/plant-operator-training
To see all the current available opportunities with HS2 and to apply, visit: hs2.org.uk/jobs-and-skills/careers-with-hs2-ltd
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #Jobs
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Both were built under powers granted by Act of Parliament; arrive in the Birmingham district of Digbeth; and with similar lengths – HS2, 140miles; the canal, 137 miles – were two of the largest civil engineering endeavours of their time.
The two are dramatically different in other respects. Compared to the sedate progress of canal boats high speed trains will travel across the 2.1mile viaduct at speeds of up to 200mph, completing the journey in just 45mins.
It comes after HS2 Ltd completed the construction of all the supporting piers on the structure – following two years’ work over land and water.
In total, 56 piers have been built to carry the viaduct. Piers need to be built in advance of the deck being laid. HS2 is using a giant launching girder to install the viaduct’s 1,000 deck segments, with the machine making its way from north to south across the Colne Valley to position them into place.
Once complete, HS2 will provide faster and far more reliable journeys between London and Birmingham, with trains running on conventional lines further north. It will also double rail capacity between the UK’s two biggest cities – relieving the most congested southern part of the West Coast Main Line, creating more capacity for local and freight services.
The viaduct construction is being led by HS2’s main works contractor Align JV – that includes Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick.
Find out more at: hs2.org.uk/building-hs2/viaducts-and-bridges/colne-valley-viaduct
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #train #bridge #engineering #viaduct #canal #drone #water
@bouyguesconstruction
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The deck segment cast on-site for the most southerly v-shaped pier over the Harefield Lake, completes the final pier for the viaduct. The v-piers form the arch of the deck over the lakes with a range of vertical, fixed buttress and expansion buttress piers over the land. The piers will support the viaduct’s deck for 2.1miles across the Colne Valley.
43 tonnes of concrete were poured into the formwork containing high-strength reinforcement steel and carefully set out post tensioning ducts, to complete the final deck segment on the v-pier. With the formwork now removed the complete final pier is revealed.
Using a giant launching girder to install the viaduct’s remaining 1000 deck segments pre-cast in a factory on-site, requires piers to be built in advance, ready for the girder to move onto as it makes its way from north to south across the Colne Valley. Highly efficient and precise project management is being maintained throughout the build to ensure the programme’s forward momentum.
The viaduct construction is being led by HS2’s main works contractor Align JV – that includes Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #update #viaduct
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
In one of the most impressive assembly operations to move sections of the machine into a 12 metre deep launch pit, two 600 tonne cranes lifted the huge new cutterhead into place at the front of the 125 metre long machine in the pit bottom.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #timelapse #timelapsevideo #tunnel
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
We spoke with Peaky Blinders creator, Steven Knight who is building a film studio within walking distance of Curzon Street Station.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #birmingham
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Named Cecilia, the TBM has driven for 10 miles underground to join twin sister machine – Florence. She arrived at the site near the Buckinghamshire town of Wendover on 27 February, after completing her adjacent tunnel drive.
Between them, the two 2,000 tonne machines have built the twin bore tunnel at depths of up to 80 metres and excavated three million cubic metres of chalk. Each machine operates like an underground factory, able to excavate the tunnels and line them with 56,000 pre-cast concrete tunnel segments, grouting them into place and moving forward at an average speed of 16 metres per day.
When HS2 is operational trains will travel through the Chiltern tunnel – the line’s longest – at speeds of up to 200mph, helping to almost halve journey times between Britain’s two largest cities.
The new high-speed line will relieve traffic the West Coast Mainline, freeing up space for more local services on the most crowded part of the important Victorian route. It will almost double rail capacity between London and the West Midlands, providing a more reliable service and driving economic growth.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #update #Tunnelling #breakthrough #timelapse #drone #train #highspeed
@HerrenknechtAG @bouyguesconstruction @DJI
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The designers and engineers working on five key HS2 viaducts have succeeded in cutting their carbon footprint by up to two thirds (66%) by adopting an innovative ‘double composite’ structure which uses significantly less concrete and steel than a more traditional design.
Designed to carry the railway over the floodplain of the River Great Ouse, the Westbury viaduct will be supported by seven evenly spaced piers, each up to 9.2m tall.
It is one of 50 major viaducts on the HS2 project – which is designed to improve connections between London, Birmingham and the North while freeing up space for more local trains on the most congested southern end of the existing West Coast Main Line into London Euston.
Because of the length of the Westbury viaduct, the deck is being assembled in three stages, with each one pushed out from the north abutment before the next section is attached behind it.
This painstaking 11-hour process means that the weight of the deck will increase with each push, up from an initial 1,145 tonnes this week to 2,695 tonnes by the end of the year.
A winch is used to push the deck forward at a speed of around 9 metres per hour, sliding across Teflon pads to reduce friction – a material usually found to the surface of a non-stick frying pan.
The double composite approach – which combines the strength of steel in tension and with concrete in compression – has huge potential to cut carbon in construction by enabling more efficient bridges.
Find out more at: hs2.org.uk/viaducts
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:16 What’s been achieved?
0:29 How is the viaduct moved?
1:21 The plan
1:53 A carbon-saving design
2:45 Landscape challenges
3:08 What happen’s once the viaduct is complete?
3:37 Thoughts about the latest works
3:54 Outro
#HS2 #Construction #update #viaduct
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Hear from MEPC, the developer leading the creation of Birmingham’s tallest building – the Octagon.
New research shows that the future arrival of HS2 in the West Midlands is already driving huge investor confidence in the region, with data pointing to an economic uplift of £10billion over the next 10 years.
Economic analysis of the areas close to HS2’s three hubs in the West Midlands - Curzon Street Station in central Birmingham, Interchange Station in Solihull, and the Washwood Heath Depot and Network Integrated Control Centre - shows dramatic increases in regeneration and investment in the last six years.
Find out more at: hs2.org.uk/hs2itwm
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #hs2itwm #regeneration #investment #westmidlands #birmingham
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #tunnelling #drone #birmingham
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Contractors working for HS2 have used a specialist push-pull technique to move the 84 metre, 300 tonne steel viaduct section into place over the westbound link road between the M6 and M42 near Coleshill.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #news #motorway #warwickshire #timelapse #viaduct
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #london #timelapse
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
A team of 20 demolition experts from Solihull-based firm Armac, working on behalf of HS2’s main works contractor in the Midlands, Balfour Beatty VINCI (BBV), carried out the demolition in just 16 hours.
The operation was coordinated in conjunction with National Highways, who were able to open the motorway section between Junctions 6 and 7 at midnight, which was 5 hours earlier than planned, reducing disruption to road users.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #demolition #news #timelapse
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The enormous 2,000 tonne machine has completed its 10-mile journey under the Chilterns. A huge milestone for the project, congratulations to everyone involved.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #drone #tunnelling
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The enormous 2,000 tonne Tunnel Boring Machine (TBM), named ‘Florence’, is one of 10 machines excavating the 32 miles of twin tunnels on the new railway linking London Euston with Birmingham, and was the first to launch, in May 2021.
The breakthrough is a major milestone for the HS2 project, which will almost halve journey times between Britain’s two largest cities, while freeing up space for more local services on the most crowded part of the existing West Coast Main Line.
Designed specifically for the geology under the Chilterns, each TBM is an underground factory – excavating the tunnel, lining it with 56,000 pre-cast concrete segments and grouting them into place as it moves forward at an average speed of 16m per day.
Once complete, HS2 will dramatically improve journeys between our two largest cities and also free up space on the existing mainline for more local trains.
Find out more at: hs2.org.uk
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #breakthrough #tunnel #train #underground #london #highspeed #drone #timelapse
@HerrenknechtAG
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The Victoria Road Crossover Box site is located to the west of where the new superhub HS2 Old Oak Common station is being constructed. The huge underground box structure will house a crossover track mechanism that will allow HS2 trains to switch between tracks, on the approach and descent from Old Oak Common station.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #exploremore #london
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The 8.4-mile tunnel will run from Victoria Road in Ealing to West Ruislip in Hillingdon – carrying trains in and out of London – and is being constructed by four huge tunnel boring machines (TBMs).
In keeping with tunnelling tradition, the fourth machine is named after a prominent woman – Lady Anne Byron. The name was chosen by the local community around Ealing through a public vote.
Lady Anne Byron was an educational reformer and philanthropist who lived between 1792 and 1860. She established the Ealing Grove School in 1834 – England’s first co-operative school which provided education for the working classes, in an era when it was mainly for the wealthy.
TBM Anne will bore 3.4 miles from Victoria Road in Ealing, near HS2’s Old Oak Common station, to Greenpark Way in Greenford, alongside TBM Emily which launched last month in February.
The other 5 miles of twin-bored tunnels has been under construction since 2022, with TBMs Sushila and Caroline both over halfway through their journey between West Ruislip, on the outskirts of London, and Greenpark Way. The quartet of TBMs are all set to complete their journeys in 2025, when they will be extracted from the ground through giant shafts at Greenpark Way.
HS2’s London tunnels contractor, Skanska Costain STRABAG joint venture, has delivered an extensive programme of work for the TBM to launch at the Victoria Road Crossover Box, excavating the caterpillar shaped box where eventually the trains will cross tracks on their way in and out of Old Oak Common station.
‘Anne’ is the eighth TBM that has been launched to date across the HS2 project between London and the West Midlands to build the mined tunnels for the trains. In all, almost half of the 65 miles worth of twin-bored tunnels needed for the route has now been excavated.
When complete, HS2 will improve connections between London and the West Midlands, with trains running further north on existing lines. Building a wholly new railway will create quicker and far more reliable journeys, driving economic growth while crucially freeing up space for more local trains on the most congested southern end of the existing West Coast Main Line.
The TBM was manufactured by world-leading experts Herrenknecht in Germany. It is one of 10 machines specially designed for HS2 and the ground through which they will bore. Two remaining TBMs, which will eventually be used to dig HS2’s final tunnel between Old Oak Common and Euston, in central London, are still being built.
SCS JV worked collaboratively with Herrenknecht on a cutting edge design that maximises productivity and achieves the highest standards in a tunnelling environment.
The TBM weighs 1,700 tonnes and is 170m in length. The cutterhead is 9.11m in diameter.
TBM Anne was lowered in parts into the 25m deep crossover box at the end of last year, where she was reconstructed and prepared for launch.
The TBM is an earth pressure balance machine which operates like an underground factory. It is effectively a large metal cylinder with a rotating cutting head at the front, which presses against the earth using hydraulic cylinders. Disc cutters and scraping tools within the cutterhead loosen the earth which is then removed using a screw conveyor. The conveyor moves the material through the back of the TBM and out of the tunnel via a conveyor belt.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:15 Where are we located?
0:32 Building the Northolt Tunnel
0:57 Northolt Tunnel East progress update
1:18 Delivering TBM parts
2:00 Manufacturing the machine
2:14 Pre-assembly
2:31 Lowering the TBM parts
2:52 Assembling the machine
3:28 Ready to launch
3:31 Outro
#HS2 #Construction #tunnelling #london
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Contractors working for HS2 have used a specialist push-pull technique to move the 84 metre, 300 tonne steel viaduct section into place over the westbound link road between the M6 and M42 near Coleshill.
This is the first of two moves to install the deck for HS2’s ‘East Link Viaduct’, which is part of the triangular Delta Junction. The second operation in April will create the full 158 metre long composite deck over both westbound and eastbound motorway link roads. Further work, including in-situ concrete deck works and parapets installation will be undertaken to complete the structure.
It was delivered by specialist steelwork company Victor Buyck Steel Construction (VBSC), working on behalf of HS2’s main works contractor Balfour Beatty VINCI (BBV). Using a push-pull jacking system which gives greater flexibility during the launch operation, it was the first time VBSC have used their specially designed technique in the UK.
The team completed the move ahead of schedule in a total of 11.5 hours during a weekend closure of the motorway link roads. Working in close collaboration with National Highways, the roads were re-opened at 2.35am on Sunday morning.
Before the end of this year, a similar two-stage operation will move the identical ‘West Link Viaduct’ which runs parallel to the East Link Viaduct.
This section of the triangular Delta Junction enables high speed trains to travel between London, Interchange Station in Solihull and Birmingham Curzon Street Station.
The first launch takes the viaduct section to its halfway position over the westbound link road. Following completion of the first launch, three further steel girders will be welded to the back of the first structure, and 40 precast slabs will be installed on top of the girders. In April, this entire structure, weighing 1,100 tonnes will then be moved to its final position over both westbound and eastbound motorway link roads.
The Delta Junction is made up of embankments, cuttings and a total of 13 viaducts taking high speed tracks over motorways, local roads, existing rail lines, rivers and floodplains. The viaducts include 6 precast segmental viaducts, 4 composite viaducts and 3 low viaducts.
The layout of the Delta Junction triangle means the railway from London curves west on a spur towards Birmingham Curzon Street Station. As trains come out of Birmingham, the line heads north to meet the main HS2 line, which will then connect to the West Coast Main Line to Manchester. The third side of the triangle allows trains to run between London and Manchester without stopping at Birmingham.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:13 What’s been completed?
0:33 About the viaduct
0:48 What is the purpose?
1:04 A collaborative effort
1:26 How was it moved?
2:33 A useful moving method
2:56 Upcoming works
3:14 Thoughts from site
3:47 Outro
#HS2 #Construction
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Exciting landmarks are rising on local skylines, attracted by the improved transport connections and business confidence that HS2 brings. Since HS2 was approved by Parliament in 2017, the number and scale of planned developments within 1.5 miles of Curzon St Station, Interchange Station and the Washwood Heath Depot, has increased dramatically. These new places to live, work and visit are projected to add £10 billion to the local economy over the next 10 years.
Since Royal Assent was granted for the railway in 2017, the number of planning applications seen in a 1.5 mile radius around these three major HS2 hubs has increased by two-thirds.
Over the same timescale, the area of total planned floorspace - including commercial and residential - has increased by 200%, and the planned number of new homes has increased by almost 500% - from 10,000 to 55,000 homes.
Find out more at: hs2.org.uk/hs2itwm
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #hs2itwm #regeneration #investment #westmidlands #birmingham
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Contractors working for HS2 have used a specialist push-pull technique to move the 84 metre, 300 tonne steel viaduct section into place over the westbound link road between the M6 and M42 near Coleshill.
This is the first of two moves to install the deck for HS2’s ‘East Link Viaduct’, which is part of the triangular Delta Junction. The second operation in April will create the full 158 metre long composite deck over both westbound and eastbound motorway link roads. Further work, including in-situ concrete deck works and parapets installation will be undertaken to complete the structure.
It was delivered by specialist steelwork company @victorbuycksteelconstruction, working on behalf of HS2’s main works contractor Balfour Beatty VINCI (BBV). Using a push-pull jacking system which gives greater flexibility during the launch operation, it was the first time VBSC have used their specially designed technique in the UK.
The team completed the move ahead of schedule in a total of 11.5 hours during a weekend closure of the motorway link roads. Working in close collaboration with National Highways, the roads were re-opened at 2.35am on Sunday morning.
Before the end of this year, a similar two-stage operation will move the identical ‘West Link Viaduct’ which runs parallel to the East Link Viaduct.
This section of the triangular Delta Junction enables high speed trains to travel between London, Interchange Station in Solihull and Birmingham Curzon Street Station.
Find out more at: hs2.org.uk
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #timelapse #drone #train #highspeed
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
A team of 20 demolition experts from Solihull-based firm Armac, working on behalf of HS2’s main works contractor in the Midlands, Balfour Beatty VINCI (BBV), carried out the demolition in just 16 hours.
The operation was coordinated in conjunction with National Highways, who were able to open the motorway section between Junctions 6 and 7 on Sunday at midnight, which was 5 hours earlier than planned, reducing disruption to road users.
Starting at 07.00 on Saturday 10 February, the demolition team used a 100 tonne excavator and a further seven 50 tonne demolition excavators to complete the operation, supplemented by numerous breaker and cruncher attachments. Six articulated dumper trucks transported the excavated material to a local stockpile where it will be crushed and reused on HS2’s haul roads and work sites.
Once the bridge was demolished at around 15.00 on Saturday , the debris was removed, the matting taken away, carriageway cleaned, and central reservation and verge restraint systems reinstated, ready for the motorway to be re-opened at midnight on Sunday 11 February.
It is the second of two 4,000 tonne bridges in close proximity over the M42 which needed to be demolished so HS2 can build a new twin box structure, which will carry the high speed line over the motorway in the future. The operation by Armac to demolish the first bridge in August last year was delivered 14 hours ahead of schedule.
Find out more: hs2.org.uk
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#timelapse #bridge #train #highspeed #construction #engineering
#HS2 #demolition
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The deck of the intersection bridge weighs the same as 25 double decker buses and will carry local trains over one of the longest cuttings along the HS2 route.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #timelapse #nightview
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Work to build the 870-metre section of Harvil Road, between Harefield and Ickenham, which is crossed by the new high speed railway, began in January 2020. Designed according to modern design regulations, each carriageway – with a width of more than three and a half metres – is wider than the road is replaces.
Carried by a new bridge over HS2, users of its 1.8m-wide footpaths will be able to glimpse high speed trains travelling at up to 200mph as they run between the line’s Copthall tunnel and the Colne Valley viaduct, which by then will be Britain’s longest rail bridge.
The pre-existing section of Harvil Road was closed to traffic as the new stretch opened. It will now be removed and the land under and around it will be greened with extensive tree and shrub planting as part of HS2’s landscaping.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
It is the third project in Washwood Heath to receive funding from HS2, with £75,000 already awarded to for the Dolphin Community Centre in Ward End Park, and another £75,000 to support an environmental project aimed at improving water quality in the Wash Brook.
Established in Birmingham in 1998, The Sähëlï Hub was originally set up as a ‘women-only’ facility to provide health and wellbeing activities, taking into account the culturally sensitive needs of local Muslim women. Since 2010, Sähëlï Hub has been running sessions for residents in Washwood Heath. Operating from three 'hubs' including Calthorpe Park in Balsall Heath, Handsworth and Alum Rock, the project's activities already benefit over 1,500 women every year.
Sähëlï Hub’s latest project, funded through the £75,000 grant from HS2, aims to encourage community members, particularly men, to get involved in group-based sports activities including cycling and tennis in and around Washwood Heath.
The HS2 Community and Environment Fund (CEF) provides funding to communities along the HS2 route for organisations disrupted by the construction of the new high speed railway.
HS2 is currently preparing for the construction of the Washwood Heath Depot, north-east of Birmingham city centre, which is where HS2 trains will be maintained, serviced and stored when not in use. Once operational, the Depot will provide over 550 high quality, long-term jobs for local people.
In February 2023, HS2 was granted Schedule 17 approval by Birmingham City Council for the Washwood Heath Depot, which includes a Maintenance Building, Network Integrated Control Centre (NICC) and Cleaners and Drivers Building.
Work on the Washwood Heath site to date includes demolition of buildings and groundworks to prepare the site for the construction of the new facility.
HS2’s funding schemes will provide up to £40m throughout the construction timeline of HS2, supporting community-led projects that improve the environment, such as tree planting and energy efficiency measures.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:38 Community funding explained
0:56 The benefits for Washwood Heath
1:52 What is the Sähëlï Hub project?
2:31 Funding across the country
2:48 Outro
#HS2 #community #funding
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #tunnelling
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #timelapse
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The Washwood Heath site has a long-standing rail history, dating back to the early 1900s, when it was first used as a railway sidings and marshalling yard. Its heavy industrial use over the last century meant the ground was highly contaminated, and specialist contractors, including Coventry-based Duo Group, have led the intense programme of work to clean up the site ready for its new beginnings at the heart of the new high-speed network.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:23 What’s happening on the site?
0:45 What is the Washwood Heath Depot?
1:04 Who are Duo Group?
1:27 What challenges faced the site team?
1:52 The remediation process
2:11 Roles with Duo Group
2:39 Working on HS2
3:01 Site progress update
3:18 Outro
#HS2 #Construction #supplychain
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #tunnelling #timelapse #trainstation #london
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #fpv #fpvdrone #dronevideo #tunnelling #london #londonlife
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Birmingham Curzon Street Station, which will be net zero carbon in operation, will be the first brand new intercity terminus station built in Britain since the 19th Century.
Starting this January, major earthworks will be prepared on site for piling and foundations work in the Spring, with construction of the main station building due to start in the Summer.
During construction itself, hundreds of jobs will be created, including an estimated 100 new entrant roles, new apprenticeship positions and Restart scheme opportunities for unemployed people.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Intro
0:05 Andy Street reacts
0:18 Job creation
0:36 Regeneration in Birmingham
0:57 Local connectivity
1:17 The design of the station
1:30 A sustainable station
1:39 Outro
#HS2 #Construction #birmingham
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The tunnel boring machine (TBM) named Lydia finished its near-kilometre long journey into the station box in a move that completes the construction of the Atlas Road Logistics Tunnel.
The 853m long tunnel, which runs from the Atlas Road logistics hub, is being built to service the programme to construct the line eastwards towards Euston. It will eventually allow materials required for the Euston Tunnel to be transported to the site without clogging up local roads or disrupting work going on elsewhere at Old Oak Common station.
HS2’s London tunnels contractor, Skanska Costain STRABAG joint venture (SCS JV) constructed the logistics tunnel using a TBM made from components repurposed from a machine previously used to construct London’s Elizabeth Line. The TBM is named Lydia, a name selected by the local community, after Lydia Gandaa – a former teacher at Old Oak Common Primary School.
The TBM broke through into the eastern end of the Old Oak Common underground station box, which is currently under construction by a separate joint venture – Balfour Beatty Vinci SYSTRA (BBVS JV). Later this year, SCS JV will lower two additional TBMs into the box and assemble them ready to bring the HS2 line into Euston. Once they are in place BBVS JV will seal the box and continue to construct HS2’s super-hub station.
Over the past nine months, TBM Lydia has removed 62,000 tonnes of London Clay, all of which is sent by rail for beneficial reuse across the UK and has installed 535 concrete rings. The segments for the tunnel rings were manufactured by Pacadar UK in Kent.
A team of 100 has been working around the clock to complete the tunnel, working in shifts to operate the TBM and the above ground operations. The experienced SCS JV team have also used their expertise to develop more team members at the early stages of their careers, including apprentices and graduates for whom this was their first time constructing a bored tunnel.
The logistics tunnel will be used to deliver materials to the two Euston Tunnel TBMs, including over 56,000 concrete tunnel segments manufactured by STRABAG in Hartlepool, and take away the London Clay excavated.
Bringing in materials by road and removing the excavated spoil for the Euston Tunnel would have been logistically challenging and would have had significant impact local roads and on the work to construct the station. The logistics tunnel was the optimum solution to enable HS2 to reach Euston. Once the Euston Tunnel is complete and the railway is operational, the logistics tunnel will be backfilled.
Following the government’s Network North announcement in October, alternative funding arrangements for the delivery of Euston station are being considered. However, work is continuing with the preparations and design of the railway between Old Oak Common and Euston.
HS2 is making significant progress on the construction of the tunnels for the new railway. The Chiltern Tunnel TBMs are due to complete their work by spring, and this will be the second twin bored tunnel that has completed by HS2, alongside the Long Itchington Tunnel. Further north, HS2 is working to complete the Bromford Tunnel. In London, two further TBMs are about to launch, part of the quartet of TBMs boring the Northolt Tunnel.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #OldOakCommon #Tunnelling
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Millie joined HS2’s construction partner for the region, Balfour Beatty VINCI (BBV), as facilities assistant but in just six months, she secured a promotion and progressed into a new role as data support analyst.
Mille now works alongside a team of highly skilled engineers to update and maintain 4D models of BBV’s intricate engineering works, ensuring records are maintained and all works are recorded in accordance with safety and environmental standards.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #jobs #skills
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Material similar to that found on non-stick frying pans was used to slide the first of three giant sections into place over 9 hours on Wednesday 10th January.
Engineers used a winch to carefully push the deck forward at a speed of around 9 metres per hour, sliding across Teflon pads to reduce friction – a material usually found to the surface of a non-stick frying pan. It is the longest deck slide on the HS2 project to date.
The 450m-long viaduct will be the first major railway bridge in the UK to be built with a ‘double composite’ approach, which uses significantly less carbon-intensive concrete and steel than a more traditional design - and has allowed HS2 to halve the amount of embedded carbon in the structure.
Due to the length of the viaduct, the deck is being assembled in three stages, ranging from 90m to 180m sections, with each one pushed out from the north abutment before the next section is attached behind it. This painstaking process means that the weight of the deck will increase with each push, up from an initial 590 tonnes this week to 3700 tonnes by the end of the year.
EKFB worked with their design partner, ASC (a joint venture between Arcadis, Setec and COWI) and architects Moxon on the ‘double composite’ approach which was inspired by structures on the French high speed TGV network.
The approach is set to cut the carbon footprint of the structure by 56% – saving almost 13,000 tonnes of embodied carbon – and helping HS2 achieve its goal of halving the amount of embedded carbon in construction.
Wendover Dean Viaduct is one of 50 major viaducts on the HS2 project – which is designed to improve connections between London, Birmingham and the North while freeing up space on the most congested southern end of the existing West Coast Main Line.
In total, HS2 is building more than 500 bridging structures – ranging from small road bridges to massive viaducts like record-breaking Colne Valley Viaduct which will become the longest in the UK.
Find out more: hs2.org.uk/building-hs2/viaducts-and-bridges/wendover-dean-viaduct
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:19 The mission
0:31 The construction process
1:03 What is the Wendover Dean Viaduct?
1:25 What’s already been completed?
1:40 Upcoming works
1:52 Reacting to the slide
2:04 Outro
#HS2 #Construction #update #slide #bridge #train #highspeed #timelapse #drone
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Join our Chief Railway Officer, Emma Head, on a 140-mile, in-depth video tour of the progress we made between London and the West Midlands throughout 2023.
Watch the full update: youtu.be/vy0KY4aKEmU?si=Riu33CzOTycgfX9b
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #update
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The HS2 Community and Environment Fund (CEF) provides funding over and above the committed mitigation and compensation to communities along the HS2 route and is available to organisations demonstrably disrupted by the construction of Phase One of HS2.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Community
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
HS2 Ltd is putting the finishing touches to a huge package of work that will eventually allow for the physical operation of the new high-speed railway between London and the West Midlands.
In 2024, we’ll let around £5 billion-worth of contracts to oversee building of the tracks, power, signalling, overhead lines and the railway’s new network control centre. They will be constructed to the highest standards to help create a new benchmark for speed and punctuality, ensuring passengers can rely on the service, even in the face of extreme weather.
Contracts will also cover a new telecom system that will allow travellers to experience uninterrupted phones calls and streaming along the entire route, including in tunnels.
The move marks a crucial turning point for the project, starting to bring the working railway to life, seven years after parliament officially gave HS2 the go-ahead.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
00:00 Introduction
01:02 Old Oak Common
01:50 Victoria Road Crossover Box
02:18 Northolt Tunnel
02:55 Colne Valley Viaduct
03:55 Chiltern Tunnel
05:06 Buckinghamshire and Oxfordshire
05:45: Chipping Warden and Greatworth Green Tunnels
06:34 Earthworks
07:16 Long Itchington Wood Tunnel to Interchange
08:20 Interchange area
08:54 Delta Junction
09:27 Bromford Tunnel
09:52 Birmingham Approaches
10:20 Closing Comments
#HS2 #Construction #engineering #train #railway #britain #highspeed
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
We're using the UK’s rail network to move 83,000 tunnel segments, minimising road traffic and drastically reducing carbon emissions.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Construction #London #Hartlepool #Tunnelling #Carbon
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.


