TES VSETINWe are active in the following segments:
Green energy -- generators, components, repairs and service for windmills and hydropower plants or co-generation plants
Traditional energy -- generators and components for diesel units and back-up power sources
Rolling-mills and iron-mills -- motors and drives
Electric traction vehicles, ships, mines, general industry -- components, generators, motors, drives
Service, repairs, reconstructions -- from installation to warranty and after-warranty service
Layout with synchronous, asynchronous, DC, and with permanent magnets
TES generators and motors - Production of electric machinesTES VSETIN2012-03-12 | We are active in the following segments:
Green energy -- generators, components, repairs and service for windmills and hydropower plants or co-generation plants
Traditional energy -- generators and components for diesel units and back-up power sources
Rolling-mills and iron-mills -- motors and drives
Electric traction vehicles, ships, mines, general industry -- components, generators, motors, drives
Service, repairs, reconstructions -- from installation to warranty and after-warranty service
Layout with synchronous, asynchronous, DC, and with permanent magnetsTES Fuel filter assembly linesTES VSETIN2019-10-30 | ...TES RotorcentreTES VSETIN2019-10-16 | Robotic production unit for assembly of rotors, turning the outer diameter of stack, runout and dimension check with feedback to lathe, balancing, protective coating.TES Hot Crimping MachineTES VSETIN2015-10-16 | Equipment for hot crimping of cable terminals in cable lugs of stators and jumpers designed and produced by TES VSETIN.
www.tes.czTES Powertrain Test StandTES VSETIN2015-06-01 | Test stand for powertrain, designed and manufactured by TES VSETIN, Czech Republic.
www.tes.czTES Rotor Winding Machine - Own DesignTES VSETIN2015-05-20 | Salient pole and salient pole rotor winding machine designed by TES VSETIN enables winding of generators or electric motors with 4 - 20 poles.
www.tes.czTES Automobile and Tractor Test StandTES VSETIN2014-10-30 | Multi-purpose test centre for automobiles and tractors produced by TES VSETIN for Mendel University in Brno.
www.tes.czTES Engine Test Stand - HOTtest at SKODA AutoTES VSETIN2014-05-16 | Test stand for combustion engines at SKODA Auto. Designed and manufactured according to VW Group guidelines by TES VSETIN.
www.tes.czTES Engine Output Test Stand - AUDITtest at SKODA AutoTES VSETIN2014-05-16 | Testing stand for engine output test at SKODA Auto. Designed and manufactured by TES VSETIN.
www.tes.czTES 2014 SKODA AUTO HOTTEST czTES VSETIN2014-04-18 | TES company testing systems at SKODA AUTO.TES 2014 SKODA AUTO AUDITTEST czTES VSETIN2014-04-18 | TES company testing systems at SKODA AUTO.TES small hydro generator - České Budějovice, Czech RepublicTES VSETIN2013-07-16 | Small hydro power plant Sokolský Ostrov, České Budějovice, Czech Republic TES provided with 3 synchronous generators type GSH630M26, 430 KVA, 231 rpm.TES small hydro generator - Marmore, ItalyTES VSETIN2013-07-10 | Small Hydro Power Plant Marmore, Italy Czech manufacturer TES VSETÍN s.r.o. (www.tes.cz) provided 2 synchronous generators. Italian power plant manufacturers Troyer SpA, a family business since 1934, provided the 2 Francis turbines and 1 four-nozzle Pelton turbine in 2011, with a total power of 2650 kWTES Vehicle Test Centre at Mendel University in BrnoTES VSETIN2013-06-04 | Vehlice test centre produced by Mezservis (now TES VSETIN) Customer: Mendel University in Brno Parameters: 4VDM 2 x 240 kW roller dynamometer test centre equipped with four 120 kW dynamometers. Automobile tests up to 240 kW per axle, 4x4 vehicles up to 480 kW. Maximum speed of tested automobiles is 200 km/h
www.tes.czTES - Manufacturing of electric rotating machinesTES VSETIN2013-02-26 | Products for subcontracting projects -- machine components built to the customer's specifications We offer an state-of-the-art manufacturing base for mechanical engineering and power engineering:
stamping and design/production of tools welding machining electrical technologies Websites: www.tes.czTES - New facility for testing electric machinesTES VSETIN2013-02-22 | Build in 10 months, new testing field for winding, assembly and testing generators with weights up to 80 tons. Up-to-date testing technology Testing is done by experienced technicians Testing capacity: 18 units/month Testing of horizontal and vertical machines of up to 4 MW Testing of low and high voltage machines 0-6,600 V, 50 Hz and 60 Hz Cooling systems IC 01, IC 06, IC 8A1W7 or IC 8A6W7 From September 2013 -- testing of synchronous generators of up to 17 MW From June 2014 -- testing of synchronous generators of up to 13 kV From 2014 -- rotor balancing of up to 32 tonsTES small hydro generators - Bulhary, Czech RepublicTES VSETIN2013-02-06 | Small hydro power plant Bulhary, Czech Republic Generators: 2 pc synhronous generator output 397 kW, speed 750 rpm, voltage 400 V Commissioned in 2006 Customer: Hydrohrom s.r.o.TES small hydro generator - Susasca, SwitzerlandTES VSETIN2013-01-29 | A SWISS PROJECT: SUSASCA HYDRO-ELECTRIC POWER PLANT For more than thirty years the Susasca mountain river hydro-electric power plant project in the Swiss canton of Lower Engadin has been worked on and abandoned. The time was never right for it. Today, however, a small hydro-electric power plant has been put into operation following plans drawn up by Markus Hintermann and Giovanni Mathis, both engineers of the Hydro-Solar company. Together with the borough of Susch, the two planning engineers are partners in the OESS-SA operating company. After a construction period of eleven months, the company has marked the inauguration of the new plant with a celebration attended by the entire population of Susch and also by well-known politicians and personalities from the world of business. Producing approximately 17 GWh of power per year with an output of roughly 3MW, the hydro-electric power plant represents a worthwhile investment in a sustainable power supply for the small community south of the Füela pass. THE CONCEPT OF THE TURBINE One of two planned sets of machinery has been installed and put into operation: a synchronous generator made by the Czech company, TES Vsetín, which produces the electrical power; and a Pelton wheel with a vertical axis and four jets made by the Kössler company, which drives the TES synchronous generator. In July 2009 the long-established company from Lower Austria was commissioned to produce, supply and assemble the turbine and put it into operation. The commission for Kössler further stipulated a ball valve as a shut-off device, a distribution device for the subsequent connection of a second machine set during the final phase of construction, flow meter devices, a hydraulic turbine regulator for the supply of oil to the jets and deflectors and to the ball valve and, finally, the supply of the generator together with the water cooling system. With a water discharge of 1 m3/s and a gross head of 364.80 meters, the turbine is designed for an effective output of 3,139 kilowatts. Ideal water flow conditions are achieved through the instalment of internally adjustable jets. PUTTING THE CONSTRUCTION INTO OPERATION. About 30 years after the first plan for the hydro-electric power plant was conceived, the concept was realized within just eleven months. On the 11th of November, 2010, the machine unit was put into operation. "Since the start of the operation we have produced up to 8 mio. kWh of electricity to date. This will eventually rise to 17 mio. kWh in an average year. That will satisfy the needs of approximately 4,500 households." said Emil Müller, Town Mayor and VR-president of the OESS SA, in his speech commemorating the official opening of the plant. He did not try to disguise his joy: "For our small community this is the project of the century, not merely as far as the investment of 15 mio. CHF is concerned, but also with regard to the expected return of up to 300,000 CHF per year." CZECH QUALITY GENERATOR RELIABLY PROVIDES A HIGH DEGREE OF EFFICIENCY For the Engadin plant-of-the-century at Susasca, only machines satisfying the operators' and planners' high criteria of quality were considered. Without any doubt, this includes generators made by TES Vsetín. The Czech producer has earned an excellent reputation on account of the use of building components by highly regarded suppliers. Only first-rate parts are used, especially for delicate components like bearings, regulators and electronics. Combining these qualities with a robust construction, the plant thus achieves a high level of reliability as well as longevity. The synchronous generator has an axis height of 800 mm, an effective performance of 3,661 KVA and rotational speed of 1,000 rpm. This synchronous generator for the Susasca plant meets expectations in every respect including a favourable tolerance of the thermal conditions, a very low noise level and a high level of efficiency. A solid warranty guarantees years of energy efficiency. The plant attests to the Czech electrical engineering company's tradition of more than 90 years.TES - Permanent magnet generatorTES VSETIN2012-10-03 | TES VSETIN developed a new permanent magnet generators line Features: Generator series with the outputs from 500 kW to 3,3 MW the weight of which is by about 30 % lighter than the comparable synchronous generators with wound rotors IEC mounting heights enabling upgrades from other generator principles Cooling variants: IC31W - totally enclosed water cooled, IC86W - air/water heat exchanger Maximizing power yield through outstanding efficiency Easy installation through compact and light design Earnings increase through wide variability of revolution speed Network compatibility secured by frequency converter Longer service intervals - no slip ringTES - Production of electric machinesTES VSETIN2012-03-12 | We are active in the following segments:
Green energy -- generators, components, repairs and service for windmills and hydropower plants or co-generation plants
Traditional energy -- generators and components for diesel units and back-up power sources
Rolling-mills and iron-mills -- motors and drives
Electric traction vehicles, ships, mines, general industry -- components, generators, motors, drives
Service, repairs, reconstructions -- from installation to warranty and after-warranty service
Layout with synchronous, asynchronous, DC, and with permanent magnets